Friday 21 June 2013

CIVIL INTERVIEW QUESTIONS(NEW)

CONCRETE MAKING MATERIALS

1. What is meant by Surkhi?
Surkhi is fine powdered under burnt bricks. It is also known as artificial pozzolona
2. Define hydration of cement?
Cement in dry state has no bonding property. When mixed with water react Chemically and becomes
a bonding agent. These reactions are called hydration.
3. Define setting of cement
When water is added to cement, hydration takes place immediately as it continuous, cement paste
which is plastic becomes stiff and rigid known as setting of cement.
4. What are pozzolonas?
These are siliceous materials which, while having no cementations values within themselves, will
chemically react with calcium hydroxide at ordinary temperature and in the presence of moisture to
form compounds possessing cementitious properties.
5. Name any 2 natural pozzolonas.
Clay and shales, opalinc cherts, diatomaceous earth, volcanic tuffs and pumicites.
6. Name any 2 artificial pozzolonas.
Surkhi, fly ash, blast furnace slag, silica fume, rice husk ash, metakaoline.
7. What is natural cement?
Natural cement is manufactured by burning and then crushing the natural cement stones. Natural
cement stones are such stones which contain 20 to 40% of argillaceous matter i.e. clay, and remaining
content mainly calcareous matter which is either calcium carbonate alone or a mixture of calcium
carbonate and magnesium carbonate.
8. What is artificial cement?
Artificial cement is manufactured by burning approximately proportioned mixture of calcareous and
argillaceous materials at a very high temperature and then grinding the resulting burnt mixture to a
fine powder.

9. What is the function of gypsum in the manufacture of cement?
In order to delay the setting action of cement, when mixed with water, a little percentage of gypsum is
added in the clinker before grinding them to fine powder.
10. What is known as clinker?
Artificial cement is manufactured by burning approximately proportioned mixture of calcareous and
argillaceous materials at a very high temperature and then grinding the resulting burnt mixture to a
fine powder. The burnt mixture of calcareous and argillaceous matter is known as clinker.
11. What are the constituents of ordinary cement?
Alumina or clay, silica, lime, iron oxide, magnesia, sulphur trioxide, Alkalies, calcium sulphate
(gypsum).
12. What are the harmful constituents of cement?
Alkalies which are oxides of potassium and sodium, and magnesium oxide are the harmful
constituents of cement.
13. What are ball mills?
Ball mills are used for grinding the clinkers. The ball mills consist of 2 to 2.5m diameter steel
cylinder. The clinkers to be ground are fed into the cylinder and the cylinder is rotated about its
horizontal axis to carry out the grinding action.
14. What are the types of cement?
Ordinary Portland cement, rapid hardening cement, low heat cement, blast furnace slag cement,
sulphate resistant cement, air entraining cement, white and coloured cement, high alumina cement,
pozzolanic cement, super sulphate cement, expansive cement, quick setting cement, water repellant
cement, water proofing cement.
15. What are the 2 methods of manufacture of cement
Dry process
Wet process
16. Define mortar.
The mortar is a paste like substance prepared by adding required amount of water to a dry mixture of
sand or fine aggregate with some binding material like clay, lime or cement.
17. Define lime mortar.
If lime is used as a binding material, the resulting mortar is known as lime mortar.
18. Define mud mortar.
When clay is used as a binding material, the resulting mortar is known as mud mortar

19. What is known as bulking of sand?
Bulking of sand means increase in its volume. Fine aggregates or sands, increase in volume when they
possess some moisture. Bulking is due to formation of a thin film of water around the fine aggregate
or sand particles. Thickness of water film goes on increasing with more and more moisture and
consequently increase in volume continues. But after certain percentage of water, volume of sand
starts decreasing with increasing amount of water. At certain percentage of water, increase in volume
completely vanishes and volume occupied by sand becomes equal to the volume of dry sand.
20. What are the types of mortars?
Mud mortar
Lime mortar
Gauged mortar
21. What is meant by grading of aggregates?
Grading of aggregate means particle size distribution of the aggregate. If all the particle of an
aggregate were of one size, more voids will be left on the aggregate mass. Properly graded aggregate
produces dense concrete and needs smaller quantities of fine aggregate and cement. Grading
determines the workability of the mix, which controls segregation, bleeding, water-cement ratio,
handling, placing, and other characteristics of the mix.
22. What are the methods of proportioning of concrete mixes?
Arbitrary standard method
Minimum voids method
Fineness Modulus method
Maximum density method
23. Define Abram’s water cement law.
According to Abram’s water cement law, the strength of concrete depends on the water cement ratio
used.
24. Define bleeding.
The tendency of water to rise to the surface of freshly laid concrete is known as bleeding.
25. Define laitance.
Water rising to the surface during bleeding carries with it, particles of sand and cement,which on
hardening form a scum layer known as laitance.


26. What are the steps adopted to control bleeding.
By adding more cement
By using more finely ground cement
By using little air entraining agent
By increasing finer part of fine aggregate
By properly designing the mix and using minimum quantity of water.
27. Define Segregation.
The tendency of separation of coarse aggregate grains from the concrete mass is called segregation.
28. What are the methods adopted to avoid segregations of concrete.
Addition of little air entraining agents in the mix.
Restricting the amount of water to the smallest possible amount.
Concrete should not be allowed to fall from larger heights.
29. Define workability.
Workability is that property of concrete which determines the amount of internal work necessary to
produce full compaction. It is a measure with which concrete can be handled from the mixer stage to
its final fully compacted stage.
30. What are the factors affecting workability.
Quantity of water in the mix
Proper grading of the aggregate mix
Ratio of fine aggregate and coarse aggregate
Maximum size of coarse aggregates
Method of compaction of concrete
31. What are the factors affecting proportioning of concrete mixes?
Water cement ratio
Cement content
Temperature
Age of concrete
Size, shape and grading of aggregate
Curing

32. Define mixing of concrete.
The process of mixing cement, water, fine aggregate and coarse aggregate in suitable proportion is
known as mixing of concrete.
33. What are the methods of consolidation or compaction of concrete?
Hand compaction
Machine compaction – i) Internal vibrators
ii) Form vibrators
iii) Surface vibrators
34. Define curing of concrete.
Curing is the operation by which moist conditions are maintained on finished concrete surface, to
promote continued hydration of cement.
35. What are admixtures?
Admixtures are ingredients other than cement, fine aggregate and coarse aggregate to improve the
quality of concrete. The addition of an admixture may improve the concrete with respect to its
strength, hardness, workability, water resisting power etc.
36. Name the types of joints in concrete.
1.Construction joints
2. Expansion joints
3.Contraction joints
4. Working joints
37. What are the types of concrete used?
Plum concrete, light weight concrete, air-entrained concrete, no-fines concrete, vaccum concrete,
water-proof concrete, reinforced cement concrete, pre-stressed concrete, cellular or aerated concrete,
foamed concrete, pre-cast concrete.
38. Mention the test adopted to test the properties of cement in laboratories?
a. Fineness
b. Consistency test
c. Setting time
d. Soundness
e. Compressive strength

39. Mention the test adopted to test the properties of cement in field?
a. Open the bag and take a good look at the cement, there should not be any visible lumps
b. Thrust your hand into the cement bag should feel cool feeling
c. Take a pinch of cement and feel between the fingers. It should give a smooth feeling not
a gritty feeling
d. Take a hand full of cement and throw it on a bucket full of water, the particle should
float for sometime before they sink.
40. Mention the test adopted to test the quality of water?
a. Determination of acids and alkalis
b. Determination of total solids.
UNIT-II
CONCRETE
1. What are admixtures?
Admixtures are ingredients other than cement, fine aggregate and coarse aggregate to improve the
quality of concrete. The addition of an admixture may improve the concrete with respect to its
strength, hardness, workability, water resisting power etc.
2. Define chemical admixtures
Chemicals mixed with concrete ingredients and spread throughout the body of concrete to favorably
modify the molding and setting properties of concrete mix known as chemical admixtures.
3. Define Mineral admixtures
It is a siliceous materials used to strengthen the durability properties that is classified as pozzolanic or
cementitious materials. It acts as by-product agent. E.g.: fly ash
4. What is accelerators?
Accelerators reduce the setting time and produce early removal of forms and speed up hardening. The
common accelerators are cacl 2, Al 2 cl, Nacl, Na 2 SO 4 .
5. What is the purpose of retarders?
Retarders increases the setting time of concrete mix and reduce the water cement ratio. Up to 10%
water reduction is achieved.
6. Define plasticizers
Plasticizers are defined as chemical admixtures added to wet concrete mix to impart adequate
workability properties.

7. Mention the types of plasticizers
a. Finely divided minerals
b. Air entraining agents
c. Synthetic derivatives
8. Define superplasticizers
Superplasticizers produce extreme workability and achieve reduction of water content without loss of
water cement ratio i.e workability.
9. Mention few mineral admixtures.
a. Fly ash
b. Silica fume
c. Rice husk ash
d. Metakaoline
e. GGBFS
10. What are the various admixtures used other than chemical and mineral admixtures/
a. Gas forming and expansive chemicals
b. Pigments
c. Antifungal admixtures
d. Curing compounds
e. Sealants
f. Flooring
g. Guniting aids.
11. Name the admixtures available in India?
a. Plasticizers
(a) Conplast P211- Water reducing plasticizers
(b) Conplast P509- Water reducing plasticizers/High performance plasticizers
b. Super Plasticizers
i. Conplast SP337- High workability aid

ii. Conplast SP430- High range water reducer

UNIT-III
MIX DESIGN
1. What is proportioning of concrete mix
Proportioning of concrete mix is the art of obtaining a suitable ratio of the various ingredients of
concrete with the required properties at the lowest cost.
2. What is the principle of mix proportioning
a. Environmental exposure conditions
b. Grades of concrete
c. Type of cement
d. Type and size of aggregates
e. Nominal maximum size of aggregates
f. Maximum and minimum cement content
g. Maximum free water cement ratio by weight
h. Degree of workability
i. Air entrained agent
j. Types of admixtures used if any
k. Maximum/ minimum density of concrete
l. Maximum/ minimum temperature of fresh concrete
m. Type of curing and mixing
n. Source of water
3. Mention the properties related to mix design
a. Durability
b. Workability
c. Strength
d. High strength concrete


4. Describe the physical properties of materials required to mix design
a. Cement
b. Aggregate
c. Water
d. Admixtures
5. Define Nominal mix
Nominal mix is permitted by IS456:2000 for concrete of strength lower than M 25
6. Define Design mix
Design mix is permitted by IS 10262-1982 and IS456:2000 for concrete of strength Greater
than M 25 is design mix.
7. List out the advantages of Design mix
a. Properties of all materials are used.
b. Cement content is low and hence the mix design is economical.
8. List out the disadvantages of nominal mix
a. Nominal mix does not say which type of sand, cement, aggregate to be used.
b. High cement is required which leads to high cost.
9. What is ACI
American concrete institute was revised to include the use of entrained air.
10. What are the data used for ACI
a. Fineness modulus
b. Unit weight of dry rodded coarse aggregate
c. Specific gravity of cement, coarse and fine aggregate
d. Absorption characteristic of coarse and fine aggregate
UNIT-IV
SPECIAL CONCRETE
1. What is the density of concrete?
The density of concrete varies between 2200 t0 2600 kg/m3

2. Define light weight concrete.
The concrete is said to be light weight concrete whose density is between 300 to 1850 kg/m3
3. Define High density concrete
The concrete is said to be High density concrete whose density is between 3360 to 3840 kg/m3
4. Name some of the natural light weight aggregate
a. Pumice
b. Diatiomite
c. Scoria
d. Volcanic cinders
e. Saw dust
f. Rice husk
5. Name some of the artificial light weight aggregate
a. Brick bat
b. Foamed slag
c. Cinder, clinker
d. Bloated clay
e. Sintered fly ash
f. Exfoliated vermiculite
g. Expanded perlite
6. Where does high density concrete is applicable.
High density concrete is used as radiation shielding agent and it has satisfactory mechanical property
7. Mention the applications of sulphur infiltrated concrete
a. Pre cast industry
b. Fencing post
c. Sewer pipes
d. Railway sleepers

8. Define Guniting or Shotcrete?
It is defined as a mortar conveyed through a hose and pneumatically projected at a high
velocity on to a surface.
UNIT-V
CONCRETING METHODS

1. Define workability.
Workability is the property of concrete which determines the amount of internal work necessary to
produce full compaction. It is a measure with which concrete can be handled from the mixer stage to
its final fully compacted stage.
2. List out the requirements of fresh concrete.
a. Mixability
b. Stability
c. Mobility
d. Compactability
e. Finishability
3. List out the Factors affecting Workability?
a. Water content
b. Mix proportion
c. Size of aggregate
d. Shape of aggregate
e. Surface texture
f. Grading
g. Admixture
4. Mention the methods to measure the workability?
a. Slump Test
b. Compaction Factor
c. Vee-Bee Consistometer
d. Kelly Ball Penetration test
e. Flow table Test
f. Vibrating table
5. Mention the values of different type of slump.
• True slump - up to 125mm from top
• Shear slump - up to 150 mm from top
• Collapse slump -150-225mm
6. List out the usage of slump values
• slump 0 – 25 mm are used in road making
• 10 – 40 mm are used for foundations with light reinforcement
• 50 - 90 for normal reinforced concrete placed with vibration
7. Define compaction factor?
Compaction Factor is the ratio of the weight of partially compacted concrete to the weight
of the concrete when fully compacted in the same mould.
8. Define Vee bee consistometer
Consistometer is based on consistency test which is a mechanical variation of the simple slump test
which includes determination of the workability of concrete.Measures consistency of concrete in
terms of time required to transform by vibration a frustum of fresh concrete sample into a cylinder.
This time is called VB time.
9. What is the use of Kelly Ball Penetration test
Kelly Ball Penetration method is used to determine the penetration of a hemispherical metal weight
into freshly mixed concrete, which is related to the workability of the concrete.
10. What is the use of flow table method
Flow table indicates consistency and proneness to segregation. It is used for aggregate of size
<40mm data-blogger-escaped-.="" data-blogger-escaped-br="" data-blogger-escaped-by="{D-250/250}*100." data-blogger-escaped-determined="" data-blogger-escaped-flow="" data-blogger-escaped-is="" data-blogger-escaped-the=""> 11. What is batching.
Batching is the correct measurement of various materials used in the concrete mix. It can be either
volume or by weight.
12. How is weight batching is obtained
Weight batching is more accurate and hence preferred weighing can be done by
a. Simple spring balance
b. Platform weighing machines
c. Automatic weighing machines
13. How is mixing operation is done in concrete
a. Hand
b. Machine
a) Tilting type
1. Charging by hand
2. Charging by machine
b)Non tilting type
1. Continuous mixer
2. Pan mixer
3. Truck mixer
14. What is the purpose of compaction?
Compaction is done to eliminate air voids in concrete.
15. What is hardened concrete and mention the factors influence its strength
Hardened concrete gives an overall idea about the quality of concrete. It depends on
a. Water cement ratio
b. Degree of compaction
c. Age of concrete
d. Richness of mix
e. Curing of concrete
f. Temperature of concrete.
16. Define curing
a. Curing is done to keep the concrete saturated until the water filled space in concrete is filled up by
the product of hydration.
b. Curing is done to prevent the loss of water by evaporation and to maintain the process of
hydration.
17. Define shrinkage
Volume change due to loss of moisture affects durability and strength, causes cracks in concrete at
different stage due to alkali aggregate reaction, sulphate action, settlement of fresh concrete is
shrinkage.
18. Define creep.
When a concrete member is loaded it deforms to a certain extent as soon as the load is applied. When
the load is kept constant, the deformation increases with time. This increase in strain under sustained
stress is called creep of concrete.
19. Mention the test conducted to test the properties of hardened concrete.
a. Compression Testing Machine
b. Flexure Strength Testing Machine
c. Lateral Extensometer
d. Split Tensile Test
e. Shear strength
f. Bond strength
20. List out the factors affecting the results of strength test.
a. Size and shape of aggregate
b. Condition of casting
c. Moisture condition
d. Bearing condition
e. Rate of loading

Chapter 1 – Bridge Works
1. Under what situation shall engineers use jacking at one end only and from both
ends in prestressing work?
During prestressing operation at one end, frictional losses will occur and the prestressing
force decreases along the length of tendon until reaching the other end. These frictional
losses include the friction induced due to a change of curvature of tendon duct and also the
wobble effect due to deviation of duct alignment from the centerline. Therefore, the
prestress force in the mid-span or at the other end will be greatly reduced in case the
frictional loss is high. Consequently, prestressing, from both ends for a single span i.e.
prestressing one-half of total tendons at one end and the remaining half at the other end is
carried out to enable a even distribution and to provide symmetry of prestress force along
the structure.
In fact, stressing at one end only has the potential advantage of lower cost when compared
with stressing from both ends. For multiple spans (e.g. two spans) with unequal span length,
jacking is usually carried out at the end of the longer span so as to provide a higher
prestress force at the location of maximum positive moment. On the contrary, jacking from
the end of the shorter span would be conducted if the negative moment at the intermediate
support controls the prestress force. However, if the total span length is sufficiently long,
jacking from both ends should be considered.
2. What is “preset” during installation of bridge bearings?
“Preset” is a method to reduce the size of upper plates of sliding bearings in order to save
the material cost. The normal length of a upper bearing plate should be composed of the
following components: length of bearing + 2 x irreversible movement + 2 x reversible
movement. Initially the bearing is placed at the mid-point of the upper bearing plate
without considering the directional effect of irreversible movement. However, as
irreversible movement normally takes place at one direction only, the bearing is
displaced/presetted a distance of (irreversible movement/2) from the mid-point of bearing
in which the length of upper plate length is equal to the length of bearing + irreversible
movement + 2 x reversible movement. In this arrangement, the size of upper plate is
minimized in which irreversible movement takes place in one direction only and there is no
need to include the component of two irreversible movements in the upper plate.
Note: “Preset” refers to the displacement of a certain distance of sliding bearings with respect to upper
bearing plates during installation of bearings.
3. In incremental launching method of bridge construction, what are the measures
adopted to enhance sufficient resistance of the superstructure during the launching
process?
(i) During the launching process the leading edge of the superstructure is subject to a large
hogging moment. In this connection, steel launching nose typically about 0.6-0.65
times span length is provided at the leading edge to reduce the cantilever moment.
Sometimes, instead of using launching nose a tower and stay system are designed
which serves the same purpose.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
5
(ii) The superstructure continually experiences alternative sagging and hogging moments
during incremental launching. Normally, a central prestress is provided in which the
compressive stress at all points of bridge cross section is equal. In this way, it caters for
the possible occurrence of tensile stresses in upper and lower part of the cross section
when subject to hogging and sagging moment respectively. Later when the whole
superstructure is completely launched, continuity prestressing is performed in which the
location and design of continuity tendons are based on the bending moments in final
completed bridge condition and its provision is supplementary to the central prestress.
(iii)For very long span bridge, temporary piers are provided to limit the cantilever moment.
4. In bridge widening projects, the method of stitching is normally employed for
connecting existing deck to the new deck. What are the problems associated with this
method in terms of shrinkage of concrete?
In the method of stitching, it is a normal practice to construct the widening part of the
bridge at first and let it stay undisturbed for several months. After that, concreting will then
be carried out for the stitch between the existing deck and the new deck. In this way, the
dead load of the widened part of bridge is supported by itself and loads arising from the
newly constructed deck will not be transferred to the existing deck which is not designed to
take up these extra loads.
One of the main concerns is the effect of stress induced by shrinkage of newly widened
part of the bridge on the existing bridge. To address this problem, the widened part of the
bridge is constructed a period of time (say 6-9 months) prior to stitching to the existing
bridge so that shrinkage of the new bridge will take place within this period and the effect
of shrinkage stress exerted on the new bridge is minimized.
Traffic vibration on the existing bridge causes adverse effect to the freshly placed stitches.
To solve this problem, rapid hardening cement is used for the stitching concrete so as to
shorten the time of setting of concrete. Moreover, the stitching work is designed to be
carried out at nights of least traffic (Saturday night) and the existing bridge may even be
closed for several hours (e.g. 6 hours) to let the stitching works to left undisturbed.
Sometimes, longitudinal joints are used in connecting new bridge segments to existing
bridges. The main problem associated with this design is the safety concern of vehicles.
The change of frictional coefficients of bridge deck and longitudinal joints when vehicles
change traffic lanes is very dangerous to the vehicles. Moreover, maintenance of
longitudinal joints in bridges is quite difficult.
Note: Stitching refers to formation of a segment of bridge deck between an existing bridge and a new bridge.
5. What are the advantages of assigning the central pier and the abutment as fixed
piers?
(i) For abutment pier to be assigned as fixed pier while the bridge is quite long, the
longitudinal loads due to earthquake are quite large. As the earthquake loads are
resisted by fixed piers, the size of fixed piers will be large and massive. In this
connection, for better aesthetic appearance, the selection of abutment as fixed piers
could accommodate the large size and massiveness of piers. Normally abutments are
relatively short in height and for the same horizontal force, the bending moment
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
6
induced is smaller.
(ii) For the central pier to be selected as the fixed pier, the bridge deck is allowed to move
starting from the central pier to the end of the bridge. However, if the fixed pier is
located at the abutment, the amount of movement to be incorporated in each bearing
due to temperature variation, shrinkage, etc. is more than that when the fixed pier is
located at central pier. Therefore, the size of movement joints can be reduced
significantly.
6. Sometimes the side of concrete bridges is observed to turn black in colour. What is
the reason for this phenomenon?
In some cases, it may be due to the accumulation of dust and dirt. However, for the
majority of such phenomenon, it is due to fungus or algae growth on concrete bridges.
After rainfall, the bridge surface absorbs water and retains it for a certain period of time.
Hence, this provides a good habitat for fungus or algae to grow. Moreover, atmospheric
pollution and proximity of plants provide nutrients for their growth. Improvement in
drainage details and application of painting and coating to bridges help to solve this
problem. Reference is made to Sandberg Consulting Engineers Report 18380/X/01.
7. In prestressing work, if more than one wire or strand is included in the same duct,
why should all wires/strands be stressed at the same time?
If wires/strands are stressed individually inside the same duct, then those stressed
strand/wires will bear against those unstressed ones and trap them. Therefore, the friction
of the trapped wires is high and is undesirable.
8. In the design of elastomeric bearings, why are steel plates inserted inside the
bearings?
For elastomeric bearing to function as a soft spring, the bearing should be allowed for
bulging laterally and the compression stiffness can be increased by limiting the amount of
lateral bulging. To increase the compression stiffness of elastomeric bearings, metal plates
are inserted. After the addition of steel plates, the freedom to bulge is restricted and the
deflection is reduced when compared with bearings without any steel plates under the same
load. Tensile stresses are induced in these steel plates during their action in limiting the
bulging of the elastomer. This in turn would limit the thickness of the steel plates.
However, the presence of metal plates does not affect the shear stiffness of the elastomeric
bearings.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
7
Fig. 1.1 Effect of steel plate in elastomeric bearing.
9. How to determine the size of elastomeric bearings?
For elastomeric bearing, the vertical load is resisted by its compression while shear
resistance of the bearing controls the horizontal movements. The design of elastomeric
bearings are based on striking a balance between the provision of sufficient stiffness to
resist high compressive force and the flexibility to allow for translation and rotation
movement.
The cross sectional area is normally determined by the allowable pressure on the bearing
support. Sometimes, the plan area of bearings is controlled by the maximum allowable
compressive stress arising from the consideration of delamination of elastomer from steel
plates. In addition, the size of elastomeric bearings is also influenced by considering the
separation between the structure and the edge of bearing which may occur in rotation
because tensile stresses deriving from separation may cause delamination. The thickness of
bearings is designed based on the limitation of its horizontal stiffness and is controlled by
movement requirements. The shear strain should be less than a certain limit to avoid the
occurrence of rolling over and fatigue damage. The vertical stiffness of bearings is obtained
by inserting sufficient number of steel plates.
10. In a curved prestressed bridge, how should the guided bearings in piers of the
curved region be oriented with respect to the fixed bearing in abutment?
To determine the orientation of guided bearings, one should understand the movement of
curved region of a prestressed bridge. Movement of prestress and creep are tangential to the
curvature of the bridge (or along longitudinal axis) while the movement due to temperature
and shrinkage effects are in a direction towards the fixed pier. If the direction of guided
bearings is aligned towards the fixed bearing in the abutment, the difference in direction of
pretress and creep movement and the guided direction towards fixed bearing would
generate a locked-in force in the bridge system. The magnitude of the lock-in force is
dependent on the stiffness of deck and supports. If the force is small, it can be designed as
additional force acting on the support and deck. However, if the force is large, temporary
freedom of movement at the guided bearings has to be provided during construction.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
8
Fig. 1.2 The diagram showing how the guided bearings in piers of the curved region is
oriented with respect to the fixed bearing in abutment.
11. In the construction of a two-span bridge (span length = L) by using span-by-span
construction, why is a length of about 1.25L bridge segment is constructed in the first
phase of construction?
Basically, there are mainly three reasons for this arrangement:
(i) The permanent structure is a statically indeterminate structure. During construction
by using span-by-span construction, if the first phase of construction consists of the
first span length L only, then the sagging moment in the mid span of the partially
completed bridge is larger than that of completed two-span permanent structure.
To avoid such occurrence, 0.25L of bridge segment is extended further from the
second pier which provides a counteracting moment, thereby reducing the mid-span
moment of the partially completed bridge.
(ii) The position of 1.25 L countering from the first pier is the approximate location of
point of contraflexure (assume that the two-span bridge is uniformly loaded) in
which the bridge moment is about zero in the event of future loaded bridge.
Therefore, the design of construction joint in this particular location has the least
adverse effect on the structural performance of the bridge.
(iii) In case of a prestressed bridge, prestressing work has to be carried out after the
construction of first segment of the bridge. If the prestressing work is conducted at
the first pier which is heavily reinforced with reinforcement, it is undesirable when
compared with the prestressing location at 1.25L from the first pier where there is
relatively more space to accommodate prestressing works.
Note: Span-by-span construction means that a bridge is constructed from one bridge span to another until its
completion.
12. What are the advantages of piers constructed monolithically with the bridge deck
over usage of bearings?
Basically, piers constructed monolithically with the bridge deck are advantageous in the
following ways:
(i) Movement of the bridge deck is achieved by the bending deformation of long and
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
9
slender piers. In this way, it saves the construction cost of bearings by using
monolithic construction between bridge deck and piers. Moreover, it is not
necessary to spend extra effort to design for drainage details and access for bearing
replacement. On the other hand, in maintenance aspect substantial cost and time
savings could be obtained by using monolithic construction instead of using
bearings as bridge articulation.
(ii) Monolithic construction possesses the shortest effective Euler buckling length for
piers because they are fixed supports at the interface between bridge deck and piers.
Note: Monolithic construction means that piers are connected to bridge decks without any joints and bearings.
13. Are diaphragms necessary in the design of concrete box girder bridges?
Diaphragms are adopted in concrete box girder bridges to transfer loads from bridge decks
to bearings. Since the depth of diaphragms normally exceeds the width by two times, they
are usually designed as deep beams. However, diaphragms may not be necessary in case
bridge bearings are placed directly under the webs because loads in bridge decks can be
directly transferred to the bearings based on Jorg Schlaich & Hartmut Scheef (1982). This
arrangement suffers from the drawback that changing of bearings during future
maintenance operation is more difficult.
In fact, diaphragms also contribute to the provision of torsional restraint to the bridge deck.
14. What is the advantage of sliding bearings over roller bearings?
In roller bearing for a given movement the roller bearing exhibit a change in pressure
centre from its original position by one-half of its movement based on David J. Lee.
However, with sliding bearing a sliding plate is attached to the upper superstructure and the
moving part of bearing element is built in the substructure. It follows that there is no
change in pressure center after the movement.
15. What are the three major types of reinforcement used in prestressing?
(i) Spalling reinforcement
Spalling stresses are established behind the loaded area of anchor blocks and this causes
breaking away of surface concrete. These stresses are induced by strain incompatibility
with Poisson’s effects or by the shape of stress trajectories.
(ii) Equilibrium reinforcement
Equilibrium reinforcement is required where there are several anchorages in which
prestressing loads are applied sequentially.
(iii) Bursting Reinforcement
Tensile stresses are induced during prestressing operation and the maximum bursting stress
occurs where the stress trajectories are concave towards the line of action of the load.
Reinforcement is needed to resist these lateral tensile forces.
16. Why is the span length ratio of end span/approach span to its neighboring inner
spans usually about 0.75?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
10
From aesthetic point of view, an odd number of spans with a decrease in length in the
direction of abutment is desirable. Moreover, spans of equal length are found to be boring.
However, the arrangement of irregular span lengths is not recommended because it gives a
feeling of uneasiness.
From structural point of view, for a multi-span bridge with equal span length, the sagging
moment at the mid-span of the end span/approach span is largest. In order to reduce this
moment, the span length of end span/approach span is designed to be 0.75 of inner spans.
However, this ratio should not be less than 0.40 because of the effect of uplifting at the end
span/approach span support.
Note: End span refers to the last span in a continuous bridge while approach span refers top the first span of a
bridge.
17. In the design of a simply supported skew bridge, which direction of reinforcement
should be provided?
In the conventional design of steel reinforcement for a simply supported skew bridge, a set
of reinforcement is usually placed parallel to free edge while the other set is designed
parallel to the fixed edge. However, this kind of arrangement is not the most efficient way
of placing the reinforcement. The reason is that in some parts of the bridge, the moment of
resistance is provided by an obtuse angle formed by the reinforcement bars which is
ineffective in resisting flexure. In fact, the most efficient way of the arrangement of
reinforcement under most loading conditions is to place one set of bars perpendicular to the
fixed edge while placing the other set parallel to the fixed end as recommended by L. A.
Clark (1970). In this way, considerable savings would be obtained from the orthogonal
arrangement of reinforcement.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
11
Fig. 1.3 The arrangement of
reinforcement in skewed bridge.
18. What are the functions of grout inside tendon ducts?
Grout in prestressing works serves the following purposes:
(i) Protect the tendon against corrosion.
(ii) Improve the ultimate capacity of tendon.
(iii) Provide a bond between the structural member and the tendon.
(iv) In case of failure, the anchorage is not subject to all strain energy.
19. What is the consideration in selecting the orientation of wing walls in the design of
bridge abutments?
There are three common arrangements of wing walls in bridge abutments based on Dr.
Edmund C Hambly (1979):
(i) Wing walls parallel to abutments
This is the simplest and shortest time to build but is not the most economical design. This
design has the advantage that it has least disturbance to existing slope embankment.
(ii) Wing walls at an angle to abutments
This is the most economical design among the three options in terms of material cost.
(iii) Wing walls perpendicular to abutments
Though it is not the most economical design, the wing walls provide a continuous
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
12
alignment with bridge decks which provide supports to parapets. However, they cause
disturbances to adjacent structures and utility services during construction. Moreover, if the
bridge is curved, the wing walls may hinder the road curvature.
One the other hand, when the wing walls are structurally connected to the abutment, then
structural advantage can be taken by the stability of box structure.
Fig. 1.4 Different orientation of wing walls.
20. In joints of precast concrete bridge segments, what are the functions of applying
epoxy adhesive?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
13
Epoxy adhesive is applied in these joints for the following purposes according to
International Road Federation (1977):
(i) It seals up the joints completely between precast concrete segments to protect the
prestressing tendons;
(ii) By filling voids and irregularities along the segment joints, it helps to reduce stress
concentrations otherwise it will be developed; and
(iii) It helps in transferring of shear between the joints in case a large single shear key is
used.
21. Under what situation should engineers use pot bearings instead of elastomeric
bearings?
In the event of high vertical loads combined with large angle of rotations, rubber bearings
are undesirable when compared with pot bearings. For instance, elastomeric bearings
require large bearing surfaces so that compression can be maintained between the contact
surfaces between the bearings and piers. Moreover, it also leads to uneven distribution of
stress on the piers and some of these highly induced stresses may damage the piers.
Consequently, pot bearings are better alternatives than elastomeric bearings in such an
scenario as suggested by David J. Lee.
22. What are the shortcomings of grillage analysis which is commonly used in
structural analysis of bridges?
Grillage analysis suffers from the following shortcomings based on E. C. Hambly:
(i) For coarse mesh, torques may not be identical in orthogonal directions. Similarly,
twists may differ in orthogonal directions.
(ii) Moment in any beams is mainly proportional to its curvature only. However, moment
in an element depends on the curvatures in the beam’s direction and its orthogonal
direction.
23. Polytetrafluoroethylene (PTFE) is commonly used in sliding bearings. Why?
The choice of sliding surface of bearings is of vital importance because the sliding surfaces
generate frictional forces which are exerted on the bearings and substructure of the bridge.
For instance, PTFE and lubricated bronze are commonly choices of sliding surfaces for
bearings. PTFE is a flurocarbon polymer which possesses good chemical resistance and can
function in a wide range of temperature. The most important characteristic of this material
is its low coefficient of friction. PTFE has the lowest coefficients of static and dynamic
friction of any solid with absence of stick-slip movement (David J. Lee). The coefficient of
friction is found to decrease with an increase in compressive stress. However, PTFE do
have some demerits like high thermal expansion and low compressive strength.
In designing the complementary contact plate with PTFE sliding surface, stainless steel
plates are normally selected where the plates should be larger than PTFE surface to allow
movement without exposing the PTFE. Moreover, it is recommended that the stainless steel
surface be positioned on top of the PTFE surface to avoid contamination of dirt and rubbish.
Lubricants are sometimes introduced to reduce the friction between the PTFE surface and
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
14
the upper stainless steel plate. Hence, the PTFE may be designed with dimples to avoid the
lubricant from squeezing out under repeated translation movements.
24. Should raking piles of a bridge abutment be placed under an embankment?
For a bridge abutment to be supported on raking piles with different orientations, the
movement between the ground and the pile group is difficult to predict. For instance, if
some of the raking piles of the bridge abutment are extended beneath an embankment, then
the settlement of embankment behind the abutment may cause the raking piles to
experience severe bending moment and damage the piles as recommended by Dr. Edmund
C Hambly (1979).
25. How do engineer determine the number of cells for concrete box girder bridges?
If the depth of a box girder bridge exceeds 1/6 or 1/5 of the bridge width, then it is
recommended to be designed as a single cell box girder bridge. However, if the bridge
depth is smaller than 1/6 of the bridge width, then a twin-cell or multiple cell is a better
choice as suggested by Jorg Schlaich & Hartmut Scheef (1982). However, one should note
that even for wider bridges with small depths, the number of cells should be minimized
because there is not much improvement in transverse load distribution when the number of
cells of box girder is increased to three or more.
26. What is sucker deck principle for variable depth bridge decks?
For a variable depth bridge deck, the depth of continuous multi-span bridge deck is
increased in pier supports and this absorbs sagging moments in the mid-span with the
consequent increase in hogging moments in pier supports. As a result, the mid-span depth
can be significantly reduced due to the reduction in sagging moment. In essence, this
sucker deck principle is applied in locations where headroom requirement is of great
concern. Moreover, in terms of structural performance, sucker decks are effective in
reducing dead loads than voided slab of equivalent uniform depth for span length between
20-40m. In terms of aesthetics point of view, the public tends to appreciate the structural
form of arches and curved soffit rather than boring uniform deck alignment. Reference is
made to Brian Pritchard (1992).
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
15
Chapter 2 – Concrete Structures
1. What are the functions of different components of a typical expansion joint?
In a typical expansion joint, it normally contains the following components: joint sealant,
joint filler, dowel bar, PVC dowel sleeve, bond breaker tape and cradle bent.
Joint sealant: it seals the joint width and prevents water and dirt from entering the joint and
causing dowel bar corrosion and unexpected joint stress resulting from restrained
movement.
Joint filler: it is compressible so that the joint can expand freely without constraint.
Someone may doubt that even without its presence, the joint can still expand freely. In fact,
its presence is necessary because it serves the purpose of space occupation such that even if
dirt and rubbish are intruded in the joint, there is no space left for their accommodation.
Dowel bar: This is a major component of the joint. It serves to guide the direction of
movement of concrete expansion. Therefore, incorrect direction of placement of dowel bar
will induce stresses in the joint during thermal expansion. On the other hand, it links the
two adjacent structures by transferring loads across the joints.
PVC dowel sleeve: It serves to facilitate the movement of dowel bar. On one side of the
joint, the dowel bar is encased in concrete. On the other side, however, the PVC dowel
sleeve is bonded directly to concrete so that movement of dowel bar can take place. One
may notice that the detailing of normal expansion joints in Highways Standard Drawing is
in such a way that part of PVC dowel sleeve is also extended to the other part of the joint
where the dowel bar is directly adhered to concrete. In this case, it appears that this
arrangement prevents the movement of joint. If this is the case, why should designers
purposely put up such arrangement? In fact, the rationale behind this is to avoid water from
getting into contact with dowel bar in case the joint sealant fails. As PVC is a flexible
material, it only minutely hinders the movement of joint only under this design.
Bond breaker tape: As the majority of joint sealant is applied in liquid form during
construction, the bond breaker tape helps to prevent flowing of sealant liquid inside the
joint .
Cradle bar: It helps to uphold the dowel bar in position during construction.
2. If on-site slump test fails, should engineers allow the contractor to continue the
concreting works?
This is a very classical question raised by many graduate engineers. In fact, there are two
schools of thought regarding this issue.
The first school of thought is rather straightforward: the contractor fails to comply with
contractual requirements and therefore as per G. C. C. Clause 54 (2)(c) the engineer could
order suspension of the Works. Under the conditions of G. C. C. Clause 54(2)(a) – (d), the
contractor is not entitled to any claims of cost which is the main concern for most engineers.
This is the contractual power given to the Engineer in case of any failure in tests required
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
16
by the contract, even though some engineers argue that slump tests are not as important as
other tests like compression test.
The second school of thought is to let the contractor to continue their concreting works and
later on request the contractor to prove that the finished works comply with other
contractual requirements e.g. compression test. This is based upon the belief that
workability is mainly required to achieve design concrete compression strength. In case the
compression test also fails, the contractor should demolish and reconstruct the works
accordingly. In fact, this is a rather passive way of treating construction works and is not
recommended because of the following reasons:
(i) Workability of freshly placed concrete is related not only to strength but also to
durability of concrete. Even if the future compression test passes, failing in slump
test indicates that it may have adverse impact to durability of completed concrete
structures.
(ii) In case the compression test fails, the contractor has to deploy extra time and
resources to remove the work and reconstruct them once again and this slows down
the progress of works significantly. Hence, in view of such likely probability of
occurrence, why shouldn’t the Engineer exercise his power to stop the contractor
and save these extra time and cost?
3. What is the function of shear keys in the design of retaining walls?
In determining the external stability of retaining walls, failure modes like bearing failure,
sliding and overturning are normally considered in design. In considering the criterion of
sliding, the sliding resistance of retaining walls is derived from the base friction between
the wall base and the foundation soils. To increase the sliding resistance of retaining walls,
other than providing a large self-weight or a large retained soil mass, shear keys are to be
installed at the wall base. The principle of shear keys is as follows:
The main purpose of installation of shear keys is to increase the extra passive resistance
developed by the height of shear keys. However, active pressure developed by shear keys
also increases simultaneously. The success of shear keys lies in the fact that the increase of
passive pressure exceeds the increase in active pressure, resulting in a net improvement of
sliding resistance.
On the other hand, friction between the wall base and the foundation soils is normally
about a fraction of the angle of internal resistance (i.e. about 0.8 ) where is the angle of
internal friction of foundation soil. When a shear key is installed at the base of the retaining
wall, the failure surface is changed from the wall base/soil horizontal plane to a plane
within foundation soil. Therefore, the friction angle mobilized in this case is instead of
0.8 in the previous case and the sliding resistance can be enhanced.
4. In designing concrete structures, normally maximum aggregate sizes are adopted
with ranges from 10mm to 20mm. Does an increase of maximum aggregate size
benefit the structures?
To answer this question, let’s consider an example of a cube. The surface area to volume
ratio of a cube is 6/b where b is the length of the cube. This implies that the surface area to
volume ratio decreases with an increase in volume. Therefore, when the size of maximum
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
17
aggregate is increased, the surface area to be wetted by water per unit volume is reduced.
Consequently, the water requirement of the concrete mixes is reduced accordingly so that
the water/cement ratio can be lowered, resulting in a rise in concrete strength.
However, an increase of aggregate size is also accompanied by the effect of reduced
contact areas and discontinuities created by these larger sized particles. In general, for
maximum aggregate sizes below 40mm, the effect of lower water requirement can offset
the disadvantages brought about by discontinuities as suggested by Longman Scientific and
Technical (1987).
5. In concrete compression test, normally 150mmx150mmx150mm concrete cube
samples is used for testing. Why isn’t 100mmx100mmx100mm concrete cube samples
used in the test instead of 150mmx150mmx150mm concrete cube samples?
Basically, the force supplied by a concrete compression machine is a definite value. For
normal concrete strength application, say below 50MPa, the stress produced by a
150mmx150mmx150mm cube is sufficient for the machine to crush the concrete sample.
However, if the designed concrete strength is 100MPa, under the same force (about
2,000kN) supplied by the machine, the stress under a 150mmx150mmx150mm cube is not
sufficient to crush the concrete cube. Therefore, 100mmx100mmx100mm concrete cubes
are used instead to increase the applied stress to crush the concrete cubes.
For normal concrete strength, the cube size of 150mmx150mmx150mm is already
sufficient for the crushing strength of the machine.
6. What are the major problems in using pumping for concreting works?
In pumping operation, the force exerted by pumps must overcome the friction between
concrete and the pumping pipes, the weight of concrete and the pressure head when placing
concrete above the pumps. In fact, as only water is pumpable, it is the water in the concrete
that transfers the pressure.
The main problems associated with pumping are the effect of segregation and bleeding. To
rectify these adverse effects, the proportion of cement is increased to enhance the cohesion
in order to reduce segregation and bleeding. On the other hand, a proper selection of
aggregate grading helps to improve the pumpability of concrete.
7. Is it desirable to use concrete of very high strength i.e. exceeding 60MPa? What are
the potential problems associated with such high strength concrete?
To increase the strength of concrete, say from 40MPa to 80MPa, it definitely helps in
improving the structural performance of the structure by producing a denser, more durable
and higher load capacity concrete. The size of concrete members can be significantly
reduced resulting in substantial cost savings. However, an increase of concrete strength is
also accompanied by the occurrence of thermal cracking. With an increase in concrete
strength, the cement content is increased and this leads to higher thermal strains.
Consequently, additional reinforcement has to be introduced to control these additional
cracks caused by the increase in concrete strength. Moreover, the ductility of concrete
decreases with an increase in concrete strength. Attention should be paid during the design
of high strength concrete to increase the ductility of concrete. In addition, fire resistance of
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
18
high strength concrete is found to be less than normal strength concrete as suggested by
Odd E. Gjorv (1994).
Though the tensile strength of high strength concrete is higher than that of normal concrete,
the rate of increase of tensile strength is not proportional to the increase of compressive
strength. For normal concrete, tensile strength is about one-tenth of compressive strength.
However, for high strength concrete, it may only drop to 5% of compressive strength.
Moreover, owing to a low aggregate content of high strength concrete, creep and shrinkage
increases.
8. What are the disadvantages of curing by ponding and polythene sheets?
The purpose of curing is to reduce the rate of heat loss of freshly placed concrete to the
atmosphere and to minimize the temperature gradient across concrete cross section.
Moreover, curing serves to reduce of the loss water from freshly placed concrete to the
atmosphere.
Ponding: This method of thermal curing is readily affected by weather condition (cold
wind). Moreover, a large amount of water used has to be disposed off the construction sites
after curing.
Polythene sheet: This method of curing is based on the principle that there is no flow of air
over the concrete surface and thereby no evaporation can take place on top of the freshly
concreted surface by provision of polythene sheets. However, it suffers from the demerit
that polythene sheets can be easily blown off in windy condition and the performance of
curing would be affected. Moreover, for water lost due to self-desiccation, this method
cannot replenish these losses.
9. Comparing the rate of “Formwork exceeding 300mm wide, horizontal or at any
inclination up to and including 5o to the horizontal” with the rate of “Formwork
exceeding 300mm wide, at any inclination more than 85o up to and including 90o to
the horizontal”, which one is higher?
The item “Formwork exceeding 300mm wide, at any inclination more than 85o up to and
including 90o to the horizontal” refers to formwork formed vertically and when compared
with formwork erected in horizontal plane, the amount of falsework required is smaller.
The item “Formwork exceeding 300mm wide, horizontal or at any inclination up to and
including 5o to the horizontal” refers to formwork to be erected in horizontal position and
in general it requires much falsework to support this type of formwork. Therefore, the rate
for this item is higher than the one mentioned in the above paragraph.
10. If concrete compression test fails, should Schmidt hammer test be adopted as an
alternative test to prove the concrete strength?
The Scmidt hammer test is based on the elastic rebound of hammer which presses on
concrete surface and it measures the surface hardness of concrete. Since the test is very
sensitive to the presence of aggregates and voids at the concrete surface, it is necessary to
take more than 10 readings over the area of test. However, it should be noted that Schmidt
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
19
hammer test measures surface hardness only but not the strength of concrete. Therefore, it
may not be considered a good substitute for concrete compression test.
11. What is the indication of shear slump and collapse slump in slump tests?
There are three types of slump that may occur in slumps test, namely, true slump, shear
slump and collapse slump.
True slump refers to general drop of the concrete mass evenly all around without
disintegration.
Shear slump implies that the concrete mix is deficient in cohesion. Consequently, it may
undergo segregation and bleeding and thus is undesirable for durability of concrete.
Collapse slump indicates that concrete mix is too wet ad the mix is deemed to be harsh and
lean.
12. In erection of falsework, for a rectangular panel inside a falsework should it be
braced along the two diagonals?
When a rectangular panel is subject to an eccentric load or a lateral load, it tends to deform
into a parallelogram with one diagonal shortening and the other elongating. Theoretically,
it is sufficient to brace along one of the diagonals (the one in tension). If one diagonal is
only allowed to brace inside the rectangular panel, it should be not braced in the diagonal in
compression because under severe lateral loading the diagonal may buckle leading to
failure of structure.
However, in actual situation lateral loads may come from both sides of the panel and hence
it should be braced in both diagonals.
13. In carrying out compression test for concrete, should test cubes or test cylinders be
adopted?
Basically, the results of compression test carried out by using cubes are higher than that by
cylinders. In compression test, the failure mode is in the form of tensile splitting induced by
uniaxial compression. However, since the concrete samples tend to expand laterally under
compression, the friction developed at the concrete-machine interface generates forces
which apparently increase the compressive strength of concrete. However, when the ratio
of height to width of sample increases, the effect of shear on compressive strength becomes
smaller. This explains why the results of compression test by cylinders are lower than that
of cubes. Reference is made to Longman Scientific and Technical (1987).
14. What is the function of rebate in a typical construction joint?
Construction joints are created on sites to facilitate the construction process. However, if
improperly constructed, the completed construction joints will leave an uneven scar on the
concrete surface and affect significantly its appearance. To avoid this, a rebate is formed
during the first pour of one side of construction joint. After the other pour is concreted, it
will hide the uneven joint inside the rebate.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
20
Fig. 2.1 A rebate.
15. If a contractor proposes to increase concrete cover beyond contractual
specification (i.e. 40mm to 70mm), shall engineers accept the proposal?
In contractual aspect, based on the requirement of General Specification of Civil
Engineering Works (1992 Edition), the tolerance of concrete cover is between +5mm
and –5mm and engineers should not accept sub-standard work because they do not possess
the authority to change the acceptance criteria. In case engineers consider contractor’s
proposal acceptable in technical point of view, consent has to be sought from the employer
regarding the changes in acceptance criteria.
From technical point of view, the effect on cracking due to an increase in concrete cover
should be considered. In general, there are three main parameters which govern crack width,
namely tensile strain at the point considered, the distance of longitudinal bar to the
concerned point and the depth of tension zone.
For the second factor, i.e. proximity of longitudinal bars to point of section, the closer a bar
is to this point, the smaller is the crack width. Therefore, closely spaced bars with smaller
cover will give narrower cracks than widely spaced bars with larger cover. Therefore, with
an increase of concrete cover, the crack width will increase which is undesirable.
16. Can grout replace concrete in normal structure?
The mixture of cement and water alone cannot replace concrete (Longman Scientific and
Technical (1987)) because:
(i) Shrinkage of grout is several times that of concrete with the same mass.
(ii) The effect of creep of grout is far more than that of concrete.
(iii) Heat of hydration of cement with water is more than normal concrete and this leads to
the problem of severe cracking.
17. Which type of bar reinforcement is more corrosion resistant, epoxy-coated bars,
stainless steel bars or galvanized bars?
Based on the experiment conducted by the Building Research Establishment, it was shown
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
21
that the corrosion resistance of galvanized steel was the worst among the three types of bar
reinforcement. For galvanized steel bars, corrosion started to occur when a certain chloride
content in concrete (i.e. 0.4% by cement weight) was exceeded. However, for epoxy-coated
bars, they extended the time taken for cracking to occur when compared with galvanized
steel bars.
The best corrosion resistant reinforcement among all is stainless steel. In particular,
austenitic stainless steel stayed uncorroded even there was chloride contamination in
concrete in the experiment. Reference is made to K. W. J. Treadaway (1988).
18. Can a concrete structure be completely free of expansion joints and contraction
joints?
Consider that the concrete structure is not subject to the problem of differential settlement.
For contraction joints, it may be possible to design a concrete structure without any
contraction joints. By using sufficient steel reinforcement to spread evenly the crack width
over the span length of the structure, it may achieve the requirement of minimum crack
width and cause no adverse impact to the aesthetics of the structure. However, it follows
that the amount of reinforcement required is higher than that when with sufficient
contraction joints.
For expansion joints, the consequence of not providing such joints may be difficult to cater
for. For example, a concrete structure has the coefficient of thermal expansion of 9x10-6 /oC
and a Young’s modulus of 34.5kN/mm2. With an increase of temperature of 20oC and it is
restricted to free expansion, then the structure is subject to an axial stress of 6.21MPa. If
the structure is very slender (e.g. concrete carriageway), buckling may occur. Therefore, the
structure has to be designed to take up these thermal stresses if expansion joints are not
provided. However, for water retaining structures, most of them are not affected by weather
conditions because they are insulated from the water they contain internally and soil
backfill that surround them. Therefore, it is expected that a smaller amount of thermal
movement will occur when compared with normal exposed concrete structure.
Consequently, expansion joints may be omitted in this case with the view that the
compressive stress induced by thermal expansion toughens the structure to limit the
development of tensile stress.
19. Does the presence of rust have adverse impact to the bond performance of bar
reinforcement?
In fact, the presence of rust in bars may not have adverse impact to the bond performance
and it depends on the types of bar reinforcement under consideration.
For plain round bars, the rust on bars improves the bond performance by the formation of
rough surfaces which increases the friction between steel and concrete.
However, for deformed bars, the same theory cannot apply. The presence of rust impairs
the bond strength because corrosion occurs at the raised ribs and subsequently fills the gap
between ribs, thus evening out the original deformed shape. In essence, the bond between
concrete and deformed bars originates from the mechanical lock between the raised ribs
and concrete. On the contrary, the bond between concrete and plain round bars derives
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
22
from the adhesion and interface friction. With such differences in mechanism in bonding,
the behaviour of bond between deformed bars and plain round bars in the presence of rust
varies. Reference is made to CIRIA Report 147.
20. General Specification for Civil Engineering Works (1992 Edition) Clause 15.09
specifies that tying wires for reinforcement adjacent to and above Class F4 and F5
finishes should be stainless steel wires. Why?
If plain steel tying wires are used for reinforcement adjacent to Class F4 and F5 finishes, it
poses the problem of rust staining which may impair the appearance of exposed concrete
surfaces. The rate of corrosion of plain steel tying wires is similar to normal steel
reinforcement. However, for tying wires with very small diameter, upon long exposure it
stands a high chance of rusting completely and these rust will stain the formwork and
significantly affect the concrete finish. Therefore, stainless steel tying wires are specified
for locations in the vicinity of high quality of finishes to avoid rust staining by corroded
typing wires.
Note: Tying wires are wires used for fixing and connecting steel reinforcement bars.
21. For long slender structures like beams, propping is required after removal of
formwork. Why?
After concreting, the time at which striking of formworks should not be too long, otherwise
it would affect the colour of concreted structures. For long span concrete structures, when
they have attained sufficient strength to support their self-weight, creep deflection may
occur in these structures if propping is not provided after the removal of formwork.
Therefore, re-propping is carried out after removing formwork and these props should not
be allowed to stand too long because creep loads may overstress them.
Note: Propping refers to provision of falsework to support slabs and beams during their gain in concrete
strength after concreting.
22. What is the difference in application between open stirrups and closed stirrups in
concrete beams?
Open stirrups are provided principally to resist shear forces in concrete beams and they are
applied in locations in which the effect of torsion is insignificant. U-shaped stirrups are
placed in the tension side of concrete beams in which shear cracks would occur. However,
when concrete beams are designed to resist a substantial amount of torsion, closed stirrups
should be used instead.
23. For column reinforcements, why is helical reinforcement sometimes designed
instead of normal links?
The use of links for column design in Britain is very popular. However, in U.S.A. engineers
tend to use helical reinforcement instead of normal links because helical reinforcement has
the potential advantage of protecting columns/piles against seismic loads. Moreover, when
the columns reach the failure state, the concrete outside hoops cracks and falls off firstly,
followed by the eventual failure of the whole columns. The peeling off of concrete outside
helical reinforcement provides a warning signal before the sudden failure of columns as
suggested by G. P. Manning (1924). In addition, it can take up a higher working load than
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
23
normal link reinforcement.
For instance, helical reinforcement is adopted in the design of marine piles in Government
piers.
Note: Helical reinforcement refers to shear reinforcement which is spiral in shapes.
24. What is the difference between epoxy grout, cement grout and cement mortar?
Epoxy grout consists of epoxy resin, epoxy hardener and sand/aggregates. In fact, there are
various types of resin used in construction industry like epoxy, polyester, polyurethane etc.
Though epoxy grout appears to imply the presence of cement material by its name, it does
not contain any cement at all. On the other hand, epoxy hardener serves to initiate the
hardening process of epoxy grout. It is commonly used for repairing hairline cracks and
cavities in concrete structures and can be adopted as primer or bonding agent.
Cement grout is formed by mixing cement powder with water in which the ratio of cement
of water is more or less similar to that of concrete. Setting and hardening are the important
processes which affect the performance of cement grout. Moreover, the presence of
excessive voids would also affect the strength, stiffness and permeability of grout. It is
versatile in application of filling voids and gaps in structures.
Cement mortar is normally a mixture of cement, water and sand. They are used as bedding
for concrete kerbs in roadwork.
25. What is the purpose of skin reinforcement for deep beams?
In BS8110, it states that secondary reinforcement should be provided for beams exceeding
750mm deep at a distance measured 2/3 depth from the tension face. Experimental works
revealed that at or close to mid-depth of deep beams, the maximum width of cracks arising
from flexure may be about two to three times larger than the width of the same crack at the
level of surface where the crack originally forms.
The presence of crack is undesirable from aesthetic point of view. Moreover, it poses
potential corrosion problems to reinforcement of deep beams. To safeguard against these
crack formation, skin reinforcement is designed on the sides of deep beams to limit the
formation of flexural crack widths. Though the principal function of skin reinforcement is
to control crack width, it may be employed for providing bending resistance of the section.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
24
Chapter 3 – Drainage Works
1. What is the function of waterstops in joints of box culverts and drainage channels?
The principal function of waterstops is to prevent liquids (e.g. water), water-borne
materials and solids to pass through concrete joints. In essence, it aims at providing
watertightness to the drainage channel.
Besides, waterstops in drainage channels or box culverts can also serve two other purposes:
(i) to avoid water contacting joints’ dowel bars and causing corrosion. (ii) to avoid water
seeping in from the underside of drainage channels or box culverts, thereby washing in soil
particles and causing voids underneath these structures and finally leading to their failure.
To serve the second purpose, obviously only one waterstop is required at any depth
location.
To serve the first purpose, a waterstop has to be installed on top of dowel bars to prevent
water from drainage channels from leaking through. On the other hand, a waterstop has to
be provided below dowel bars to avoid underground water from surging upwards.
In fact, the other way out to serve the first purpose is by using corrosion resistant bars.
2. What are the differences in applications between pipe culverts and box culverts?
Basically, a culvert means a covered hydraulic structure which conveys fluid. Therefore in
a broad sense, pipe culverts in a small scale represent normal pipes like precast concrete
pipes.
In terms of hydraulic performance, circular section is the best geometrical sections among
all. Therefore, for relative small discharge, precast concrete pipes and ductile iron pipes are
normally used which are circular in shape. But for applications of very large flow, precast
concrete pipes and ductile iron pipes may not be available in current market. In this
connection, cast-in-situ construction has to be employed. It is beyond doubt that the
fabrication of formwork for circular shape is difficult when compared with normal box
culvert structures. However, circular shape is the most hydraulic efficient structure which
means for a given discharge, the area of flow is minimum. Therefore, it helps to save the
cost of extra linings required for the choice of box culverts.
However, box culverts do possess some advantages. For example, they can cope with large
flow situation where headroom is limited because the height of box culverts can be reduced
while the size of pipe culverts is fixed. Secondly, for some difficult site conditions, e.g.
excavation of structure in rock, for the same equivalent cross-sectional area, the width of
box culverts can be designed to be smaller than that of pipe culverts and this enhances
smaller amount of excavation and backfilling.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
25
Fig. 3.1 Small spatial
requirement of box culver
than pipes.
3. What are the limitations of Rational Method in calculating runoff?
Computation of runoff is a complicated matter which depends on many factors like the
ground permeability, rainfall duration, rainfall pattern, catchment area characteristics etc.
Basically, Rational Method is a means to find out the maximum discharge suitable for
design purpose. In this method, it is assumed that the rainfall duration is the same as the
time of concentration and the return period of rainfall intensity is the same as the peak
runoff. Time of concentration refers to the time required for the most remote location of
stormwater inside the catchment to flow to the outlet. When the time of concentration is
equal to the rainfall period, the maximum discharge occurs and rainfall collected inside the
catchment comes to the same outlet point.
Rational Method provides the peak discharge only and it cannot produce a hydrograph. If a
more detailed pattern of runoff is required, unit hydrograph or other methods have to be
used. The accuracy of rational method depends very much on our correct selection of
runoff coefficient and delineation of catchment area.
Rational Method is a rather conservative method. One of the basic assumptions of the
rational formula is that the rainfall intensity must be constant for an interval at least equal
to the time of concentration. For long duration of rainfall, this assumption may not hold
true. Moreover, the runoff coefficient in Rational Method is difficult to be determined
accurately and it depends on many factors like moisture condition of soils, rainfall intensity
and duration, degree of soil compaction, vegetation etc. In addition, In Rational Method the
runoff coefficient is independent of rainfall intensity and this does not reflect the actual
situation.
4.Why are some manhole covers made of cast iron while some are made of ductile
iron?
Traditionally, manholes covers are made of cast iron. However, in the viewpoint of pipe
maintenance, frequent opening of manhole covers has to be carried out. Therefore, it poses
potential safety hazard to the workers during the lifting-up process of manhole covers
because cast iron manhole covers are very heavy to normal workers. Consequently,
research has been conducted and ductile iron is considered as a better choice than cast iron
because it can resist the same traffic loads with lower self-weight. Moreover, as ductile iron
is less brittle than cast iron, the traditional cast iron manhole covers are more susceptible to
damage and thus requires higher maintenance cost.
However, ductile iron manhole covers do suffer from some demerits. For instance, owing
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
26
to their relative low self-weight, vehicles passing over these manhole covers would lead to
the movement of covers and generate unpleasant noises. To solve this problem, instead of
increasing the self-weight of ductile iron manhole covers which similarly causes safety
problems to workers during regular maintenance, the covers can be designed to be attached
to the manhole frames which hold them in firm position.
5. Why is it preferable to design stormwater drains to match soffit?
Stormwater drains collect stormwater in their corresponding catchment areas during
rainstorm and convey the collected water through outlets to the sea. Therefore, in
considering the hydraulic design of stormwater drains, other than normal drainage pipe
capacity to be taken into consideration, one should check the backwater effect due to tidal
condition at outlets if the drains are located quite close to the downstream end of outlets.
Stormwater drains are normally designed to match soffit to avoid surcharging by backwater
effect or when the downstream pipes are running full. Normally pipe size increases from
upstream to downstream. For the case of matching drain invert, when outlet pipes are fully
surcharged by tidal effect of the sea or when the downstream pipes are fully filled with
stormwater, pipe sections immediately upstream of the outlet are also surcharged too.
However, for the case of matching pipe soffit, the immediate upstream sections of outlet
pipes are not totally surcharged even though downstream pipes are running full. However,
it is not always practical to maintain soffit for all pipelines because it requires sufficient
drop to achieve this.
Moreover, the flow of stormwater is mainly by gravity in the design of stormwater drains.
In case the drains are designed to match invert, then it stands a high probability that the
flow in the upstream smaller pipes has to be discharged against a head.
Note: Matching soffit means that all pipelines are aligned continuously with respect to the pipelines’ crown
level.
Fig. 3.2 Match soffit VS match invert.
6. What is the application of inverted siphons? What are the disadvantages of using
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
27
inverted siphons?
Inverted siphons are designed at locations in which a sewer system is blocked by
underground utilities or stormwater drains. They are sometimes called depressed sewers
because it is claimed that there is no actual siphon action. They connect the upstream and
downstream sewers with U-shaped vertical alignment such that they are always running
full.
The drawbacks of inverted siphons are:
(i) They induce additional head loss to the sewer system which is undesirable in
hydraulic performance;
(ii) U-shaped siphons create sediment accumulation problem and previous experience
showed that inverted siphons were easily blocked due to siltation;
(iii) Maintenance of invert siphons is difficult due to its inaccessibility.
7. What is the mechanism of cavitation in pipes and drains?
Cavitation refers to the formation of air bubbles in fluid in low-pressure condition which is
lower than the saturation pressure. It is a potentially damaging condition in which the fluid
in pipes or sewers is at high velocities. By Bernoulli’s Equation, at high flow velocities, the
pressure head of fluid is reduced accordingly. As the fluid pressure is less than saturation
pressure, dissolved gases are released from the fluid and these air bubbles will suddenly
collapse when the flow enters into a region of higher pressure. This produces a high
dynamic pressure which causes damage to the pipelines due to its high frequency.
8. When a drainage system (i.e. u-channels with catchpits) is connected to a main
drainage channel, a segment of short pipe is used. What is the reason of such
arrangement?
There are three scenarios of such connection arrangement: (a) a new drainage system is
connected to an existing drainage channel (b) an existing drainage system is connected to a
new drainage channel (c) a new drainage system is connected to a new drainage channel.
For all scenarios, what engineers consider is the total amount of differential settlement or
lateral movement to be encountered between the drainage system and main drainage
channel. For scenario (b) and (c), it is very likely that substantial differential settlement will
occur and this will cause damage to the connecting concrete pipes. Therefore a segment of
short pipes are designed so that they serve to provide flexibility to the pipes in case of
uneven settlement occurring between drainage system and main drainage channels.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
28
Fig. 3.3 Short pipe.
9. What are the functions of bedding under stormwater drains?
Bedding, which are normally made of granular materials or concrete, serves four main
functions as suggested by O. C. Young and J. J. Trott:
(i) To enhance a uniform support under pipes in order to reduce the bending moment
longitudinally;
(ii) To increase the load-supporting strength of the pipes;
(iii) For pipes with spigot and socket joints, it enables pipes to be supported along pipe
lengths instead of pipe sockets. Otherwise, uneven stress may be induced and it may
damage the pipes;
(iv) To provide a platform for achieving correct alignment and level during and after
construction.
10. In designing sewer pipes, why are vitrified clay pipes commonly used for pipe size
less than 600mm while precast concrete pipes with PVC lining is used for pipe size
exceeding 600mm?
The market price of vitrified clay pipes is generally less than that of precast concrete pipes
with PVC lining. Therefore, for small size of pipes (pipe diameter less than 600mm) it is
more economical to use vitrified clay pipes. However, vitrified clay pipes do suffer from
the problem of brittleness and its effect is even severe for larger size of pipes. Moreover, it
is rather time consuming to deliver clay pipes products because the majority of them are
manufactured in Europe. Hence, for larger size of sewer pipes (diameter more than 600mm)
it is customary to use precast concrete pipes with PVC lining.
11. Nowadays, most flap valves are made of HDPE. What are the advantages of using
HDPE when compared with cast iron?
(i) It has no reaction with sewage and seawater and does not suffer from the corrosion
problem associated with cast iron.
(ii) No protective coating is required and it is almost maintenance-free.
(iii) HDPE flap valves require very low opening pressure in operation (like 5mm water
level difference). For cast iron flap valves, due to its own heavy self-weight, the
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
29
required opening pressure of cast iron flap valves is higher than that of HDPE flap
valves. This criterion is essential for dry weather flow conditions.
However, the pressure resistance of HDPE flap valves is not as good as cast iron flap
valves. For instance, a typical 450mm wide HDPE flap valve can only withstand about 5m
water column.
12. What are the functions of the following features observed in a typical manhole? (i)
groove near benching, (ii) R.S.J. (iii) double seal manhole cover and (iv) u-trap with
rodding arm.
(i) The groove is used to facilitate the maintenance of manholes and sewer/drain pipes.
Shutoff boards are erected on the grooves during maintenance operation so that water
flow coming from upstream is terminated in the manhole and backwater from
downstream is also blocked. In addition, the groove also facilitates water flow
diversion for routine maintenance operation.
(ii) R.S.J. is a small-scale size of universal beams and is used for resisting the high
stresses incurred by heavy traffic loads acting directly on the upper narrow projected
section of manholes.
(iii) Double seal terminal manhole covers are used for sealing off gases emitted inside
sewer/drains and prevent them from releasing out of the manhole.
(iv) U-trap with rodding arms is also used for sealing off unpleasant gas smell by the
trapped u-shaped water columns. Rodding arm is normally closed with rubber rings
during normal operation. However, during maintenance operation, the rubber ring is
removed and rodding can be carried out through the rodding arm.
13. The spacing of manholes in straight sections for different pipe sizes is stated in
Stormwater Drainage Manual. How are these figures arrived at?
For pipe size < 300mm, rodding is usually adopted in which workers place about 1m long
rods through the pipes to the location of blockage and manually operate the rod to clear the
blockage.
For pipe size < 700mm, water-jetting is normally employed in which water is supplied
from nearby fire hydrants and pressurized water jet is used for clearing blockage.
Winching method is adopted for all sizes of pipes.
For instance, for pipe size exceeding 1050mm, it is stated in Stormwater Drainage Manual
that maximum intervals between manholes along straight lengths should be 120m. This is
because for sizes over 1050m, the main method of pipe maintenance is by winching whose
maximum length of operation is 120m. Similarly, the maximum intervals of manholes for
other straight pipes are derived from their corresponding maintenance methods.
14. In selection of dams in drainage channels, what are the advantages of using rubber
dams instead of steel-gate dams?
The advantages of rubber dams are as follows:
(i) Since rubber is flexible in nature it is capable of performing deflation even in the
presence of dirt and sedimentation on the downstream side. However, for rigid
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
30
steel-gate dams, it may not be possible to open when there is excessive sediment.
(ii) Since the foundation of rubber dams is comparatively lighter than that of steel-gate
dams, it saves both construction cost and time.
(iii) Rubber dams can be designed with longer spans without piers while steel-gate dams
require intermediate piers for long spans.
15. Should air test or water tests be selected to test the leakage of constructed gravity
pipelines?
For gravity pipes, air tests or water tests are carried out after completion of laying and
jointing of the pipes. These tests are conducted to check the watertightness of joints and to
ensure the pipelines are free from damage where leakage may occur.
Air test has the advantage that the test itself is simple and faster to be carried out. It does
not require the disposal of significant quantities of water used in the test which is a
mandatory requirement for water test. However, in case leakage exists in the constructed
segment of gravity pipelines, the position of leakage can hardly be located in air test.
Moreover, the rate of water leakage cannot be determined from air tests. In addition, air test
is readily affected by atmospheric condition because air has a relatively high coefficient of
thermal expansion. The test is also influenced by the moisture condition of the test
pipelines because it affects the passage of air through the pipelines.
For water test, though it is comparatively slow, it can detect the location of water leakage.
However, the leakage rate results from water test may not truly reflect its actual leakage
because pipeline materials like concrete and clay are porous and would absorb water during
the test.
16. In designing of access ramps for drainage channels, why should the direction of
access ramps be sloping down towards downstream?
In the design of access ramps, the direction is normally specified to be sloping down
towards downstream so as to avoid the occurrence of over-shooting of flowing water for
supercritical flow in case of aligning the ramps in the reverse direction of channel flow.
Note: Access ramps refer to ramps used for maintenance vehicles during routine maintenance of channels.
17. When branch pipelines are connected to main pipelines, sometimes Y-junctions or
fitting branched pipelines to main pipelines by formation of holes in main pipelines
are used. Which one is a better choice?
By using standard precast units of Y-junction branch pipelines, it is beyond doubt that
joints between branched pipelines and main pipelines are properly formed and the quality
of joints is relatively less dependent on workmanship. However, it suffers from the problem
that with fixed precast units of Y-junctions, sometimes it may be difficult for contractors to
determine the precise orientation of specific angles of Y-junctions with respect to gullies.
(e.g. gullies are connected through side branches to carrier drains)
By forming elliptical holes in main pipelines and fitting the side branches into them with
cement mortar, the quality of pipe joints is highly dependent on workmanship. It is
commonly found that in subsequent CCTV inspections side branches are projected inside
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
31
main pipes. This is undesirable because the projected side branches reduce the cross
sectional area of main pipes locally and affect their hydraulic performance. Moreover, the
projected side pipes may trap rubbish and dirt in the vicinity. On the other hand, cement
mortar may not be properly applied at connection joints because these areas are hidden
from view and are difficult to be inspected by engineers. Therefore, in selecting between
the two available methods, engineers should make their own judgments based on the above
considerations.
Fig. 3.4 Y-junction in drainage pipes.
18. Rational Method should not be used for large catchments in estimating peak
runoff. Is it true?
Rational Method is suitable for small catchments only because the time of concentration of
small catchments is small. In Rational Method the peak runoff is calculated based on the
assumption that the time of concentration is equal to the rainfall duration. For small
catchments, this assumption may hold true in most circumstances. One of the assumptions
of Rational Method is that rainfall intensity over the entire catchment remains constant
during the storm duration. However, in case of a large catchment it stands a high
probability that rainfall intensity varies in various part of the large catchment. In addition,
for long duration of rainfall, it is rare that the rainfall intensity remains constant over the
entire rainstorm and a shorter duration but a more intense rainfall could produce a higher
peak runoff. Moreover, a reduction of peak runoff is also brought about by the temporary
storage of stormwater like channels within the catchment.
In actual condition, the runoff rate within the catchment varies from place to place because
of different soil properties and past conditions. As suggested by Bureau of Public Roads
(1965), sometimes the peak discharge occurs before all of the drainage area is contributing.
For instance, when a significant portion of drainage area within the catchment has very
small time of concentration so that a higher rainfall intensity can be used for this portion,
the runoff coming solely from this portion is higher than that of the whole catchment in
which a lower rainfall intensity is adopted because the remaining part of the catchment has
comparatively large time of concentration. Therefore, this results in incorrect estimation of
peak runoff of large catchments if Rational Method is adopted.
19. What is the purpose of carrying out water absorption test for precast concrete
pipes?
Cement will mix with more water than is required to eventually combine during hydration
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
32
of cement paste. As such, some voids will be left behind after the hydration process which
affects the strength and durability of concrete. With the presence of air voids in concrete, it
is vulnerable to penetration and attack by aggressive chemicals. Good quality concrete is
characterized by having minimal voids left by excess water and therefore, water absorption
test for precast concrete pipes is adopted for checking the quality of concrete in terms of
density and imperviousness.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
33
Chapter 4 – Earthworks
1. In soil compaction test, if a test result exceeds 100%, should engineers accept the
result?
Soil compaction is the process of increasing the soil density by reducing the volume of air
within the soil mass.
Soil compaction depends mainly on the degree of compaction and the amount of water
present for lubrication. Normally 2.5kg rammers and 4.5kg rammers are available for
compaction in laboratories and the maximum dry densities produced by these rammers
cover the range of dry density obtained by in-situ compaction plant.
Regarding the second factor of water content, it affects the compaction in the following
ways. In low water content, the soils are difficult to be compacted. When water content is
increased gradually, water will lubricate the soils and this facilitates the compaction
operation. However, at high water content, as an increasing proportion of soils is occupied
by water, the dry density decreases with an increase in water content.
For soil compaction tests, the dry density obtained from compaction carried out in-situ by
vibrating roller/vibrating plate is compared with the maximum dry density conducted in
laboratories using 2.5kg rammer of compaction with similar soils. In essence, the in-situ
compaction is compared with the compacting effort of using 2.5kg (or 4.5kg) rammer in
laboratories. In case the compaction test results indicate values exceeding 100%, it only
means that the in-situ compaction is more than that being carried out in laboratories which
is treated as the basic criterion for satisfactory degree of soil compaction. Therefore, the
soil results are acceptable in case compaction test results are over 100%. However,
excessive compaction poses a risk of fracturing granular soils resulting in the reduction of
soil strength parameters.
2. What are the different applications of draglines, backhoes and shovels?
An excavator is defined as a power-operated digging machine and it includes different
types like shovels, draglines, clamshells, backhoes, etc.
A dragline possesses a long jib for digging and dumping and it is used for digging from
grade line to great depths below ground. Its characteristic is that it does not possess positive
digging action and lateral control of normal excavators. A dragline is normally deployed for
bulk excavation.
A backhoe is designed primarily for excavation below ground and it is especially employed
for trench excavation works. It digs by forcing the bucket into soils and pulling it towards
the machine and it possesses the positive digging action and accurate lateral control.
A shovel is a machine that acts like a man’s digging action with a hand shovel and hence it
is called a shovel. It digs by putting the bucket at the toe of excavation and pulling it up.
Though a shovel has limited ability to dig below ground level, it is very efficient in digging
above ground like digging an embankment.
3. For compaction of free-draining sands or gravels, what is the optimum moisture
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
34
content to achieve maximum density?
The compaction curve of sandy materials is totally different from that of clayey materials.
For sands or gravels, there are two situations of maximum density, namely the completely
dry condition and the complete water saturation. For moisture content of sands and gravels
between these two states, the dry density obtained is lower than that obtained in the
above-mentioned states. The presence of capillary forces account for the difficulty of
compaction sand at water contents between virtually dry and saturated state. They are
formed in partially filled water void between soil particles and perform as elastic ties
cementing soil particles together. Reference is made to Lars Forssblad (1981).
The compaction curve for clay is suitable for the majority of soil types except sands and
gravels because a small amount of clay in soils is sufficient to make the soils impermeable.
4. Is it worthwhile to carry out tests on particle density of soil particles for
geotechnical design?
Particle density of soils is defined by the ratio of soil particle mass and soil particle volume.
Depending on soil types, the range of variation of soil particle density varies not
significantly, i.e. by 4%. Therefore, it may not be worthwhile to order laboratory tests and
incur additional expenditure just to determine the particles density by recognizing that the
variation of particles density is not significant.
5. In determining the effective stress parameters of a soil sample, which test is
preferable, consolidated undrained test or consolidated drained test?
The effective stress parameters of a soil sample can be obtained from both consolidated
undrained test and consolidated drained test. However, consolidated undrained test is
normally selected because of the following reasons:
(i) Time taken for consolidated undrained test is shorter than that of consolidated drained
test. It is because consolidated drained test requires the full dissipation of excess pore
water pressure of the soil during testing and it takes long time when soils of low
permeability are tested.
(ii) Useful information can be obtained from the stress path of consolidated undrained test.
(iii)Failure occurs in lower stress level when compared with consolidated drained test.
6. In conducting triaxial test to determine shear strengths for soil samples, what
consolidation pressures should be specified?
It appears that the selection of consolidation pressure is independent of in-situ soil stress
theoretically. However, this may not be correct because the actual shear strength envelopes
for soils are non-linear over a wide range of stresses. Therefore, consolidation pressure
corresponding to the range of stresses relevant to site condition should be adopted.
7. What is the relation of bearing pressure on soil nail head to the ratio La/Lb, where
La is the length of soil nail before the potential slip circle while Lb is the length of soil
nail beyond the potential slip circle?
The unstable soil mass before the potential circular slip is resisted by two components: soil
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
35
nail head bearing pressure and friction of soil nail in the unstable soil mass. Therefore, the
longer is the length of soil nail before potential slip circle La, the higher is the proportion of
forces being resisted by frictional forces and hence the smaller amount is to be resisted by
soil nail head. Hence, the smaller the ratio La/Lb, the greater is the resistance provided by
soil nail head.
Fig. 4.1 La & Lb in slopes.
8. Soil nails are mainly designed for stabilization of major slips. How should designer
cater for the stability of minor slips?
There are some methods to treat minor slips:
(i) Adoption of smaller diameter size bars at closer spacing;
(ii) Installation of tie beams at the same horizontal levels;
(iii) Provision of steel wire meshes in-between soil nails; and
(iv) Provision of short soil nails in combination of long soil nails.
9. What are the main reasons for conducting pull-out tests for soil nails?
There are mainly four reasons for this test:
(i) To check and verify the bond strength between soil and grout adopted during the
design of soil nails. This is the main objective of conducting soil nail pull-out test.
(ii) To determine the bond strength between soil and grout for future design purpose.
However, if this target is to be achieved, the test nails should be loaded to determine
the ultimate soil/grout bond with a upper limit of 80% of ultimate tensile strength of
steel bars.
(iii) To check if there is any slippage or creep occurrence.
(iv) To check the elastic and plastic deformations of test nails. This is observed during the
repeated loading and unloading cycles of soil nails.
Note: Pull-out tests are carried out by applying specified forces in an attempt to pull out the constructed soil
nails.
10. Are there any differences in the methods of compaction between clayey soil
material and sandy material?
As suggested by Lars Forssblad (1981), the three main actions of compaction are static
pressure, impact force and vibration. Different compactors contain one or more modes of
these actions. For example, vibratory tampers perform mainly by the principle of impact
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
36
while vibratory rollers work with principle of static pressure and vibration.
For sandy soils, vibration is adequate for normal compaction because the action of
vibration sets the soil particles in motion and friction forces between soil particles are
virtually demolished. During this vibration motion, the soil particles rearrange themselves
to develop a dense state.
For normal soils, it is necessary to combine the action of vibration together with static
pressure to breakdown the cohesion forces between soil particles in order to allow for
better compaction. The static pressure of vibratory machines is adopted to exert a shearing
force to eliminate the cohesion in clayey soils.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
37
Chapter 5 – Piers and Marine Structures
1. Why is sulphate-resisting cement not used in marine concrete?
The main components of Portland cement are tricalcium silicate, dicalcium silicate,
tricalcium aluminate and tetracalcium aluminoferrite. In sulphate-resisting cement, it
contains a low amount of tricalcium aluminate in order to avoid sulphate attack. Otherwise,
tricalcium aluminate would react with sulphates to form calcium sulphoaluminate and
gypsum that cause expansion and crack the concrete structure.
However, for marine concrete sulphate-resisting cement should not be used because
tricalcium aluminate has high affinity for chloride ions. This is based on the possible
reaction of chloride ions and tricalcium aluminate to form calcium chloroaluminate hydrate
as suggested by P. Kumar Mehta (1991) and the reduction of which may increase the rate of
chloride attack to the concrete marine structure and result in faster corrosion of steel
reinforcement in marine structures.
2. Shall a layer of wearing course or additional thickness be designed on the surface of
piers?
In the design of piers, consideration should be given to the effect of wearing action caused
by passengers, other traffics and even sometimes vehicles. In maritime environment, the
durability and integrity of concrete is detrimental to the servicing life of piers because it
acts an essential barrier to chloride attack. However, in view of these gradual wear and tear
generated by the loading traffic, some forms of surface protection should be provided on
top of pier surface like wearing course or additional increase in concrete cover.
3.What is the difference in application of surface-protecting fenders and
energy-absorbing fenders?
Surface-protecting fenders are fenders that induce high reaction forces to berthing
structures for the energy absorbed while energy-absorbing fenders are fenders which
transmit low impact to berthing structures for the energy absorbed (Carl A. Thoresen
(1988)). In fact, the principal function of fenders is to absorb the berthing energy and
transmit a force to the structures without damaging them. Therefore, in open berth
structures, it is desirable to use energy-absorbing fenders to reduce the loads acting on the
relatively flexible structures. On the other hand, for solid berth structures the usage of
surface-protecting fenders is adequate because they are capable of taking up large berthing
loads.
4. Should dolphins be designed in a rigid manner, i.e. resting on several raking piles?
In designing dolphins, they are normally supported on a system of three to four raking piles.
This in essence is a rigid structure and exhibits little flexibility e.g. movement against
impact and berthing loads by vessels. In fact, this kind of design may not be desirable in
terms of maintenance because the dolphins are readily susceptible to damage by high
berthing vessels. To rectify this situation, some energy absorption devices like
rubber/plastic fenders have to be installed to reduce the impact load deriving from its own
deflection. On the other hand, by designing dolphins as flexible structures capable for
allowing slight deflection, it helps to reduce the large forces generated during berthing of
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
38
vessels. In this connection, one way of designing dolphins as flexible structures is by
provision of a single pile only.
Note: For a rigid structure, it takes up external loads without undergoing excessive deformations.
5. In connecting fenders to pier structures, should single lock nuts or double lock nuts
be used?
In many pier structures the connection of fenders to piers is achieved by using single lock
nuts. However, they do not perform well because some timber fenders loosen more easily
when subject to vibrating loads due to berthing, wave and tidal actions. To solve this
problem, double lock nuts should be adopted as they prove to function satisfactory in other
structural elements which are subject to frequent vibration loads.
Note: Double lock nuts mean two nuts are adopted in a single bolt connection between fenders and marine
structures.
6. What is the design level of landings in piers?
Landings are designed as resting place for passengers during berthing and deberthing of
vessels. In general, landings are provided near mean high and mean low water levels to
facilitate embarking and disembarking of passengers (BS6349: Part 2: 1988). Therefore,
the level of landing steps should be different from place to place because of different mean
high and mean low water levels in different locations.
7. What are the pros and cons of using timber fenders, plastic fenders and rubber
fenders?
Timber fenders:
They are low in strength and are subject to rotting and marine borer attack. Moreover, they
have low energy absorption capacity and the berthing reaction depends on the point of
contact. The contact pressure between fender and vessels are high. They are considered to
be environmentally unfriendly because they consume tropical hardwoods in their
production.
Plastic fenders:
Their strength is similar to that of timber fenders but they have relatively high abrasive
resistance. They are resistant to chemical and biological attack. Their energy absorption
capacities are moderate and the berthing reactions are also dependent on the point of
contact. The reaction is lower when compared with timber fenders for a given energy
absorption. They are considered to be environmental friendly because they are
manufactured from recycled material.
Rubber fenders:
They possess high abrasive resistance and are also resistant to most biological and chemical
attacks. They have moderate to high energy absorption capacity and the energy absorption
performance is independent of the point of contact. Similar to plastic fenders, they are also
environmental friendly products.
8. Why are most marine piles circular in cross section?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
39
For marine piles, there are several options available for selection, namely H-piles, circular
pipes and box piles.
However, only circular piles and box piles are suitable for marine application because of
the following two reasons suggested by G. M. Cornfield (1968):
(i) Circular piles and box piles possess high column buckling strength. For marine
structures like jetties, piles are well above seabed level and therefore the column
buckling effect is significant when compared with other structures. Therefore, it is
essential to use pile sections which have relatively high buckling strength in piers.
(ii) Circular piles and box piles display high energy absorbing capability. For marine
structures like dolphins and fenders, which require substantial amount of berthing
energy to be absorbed, these piles sections are inevitably good choices.
In marine structures, it appears that circular sections prevail over the box sections. The
main reason is that the range of section available for selection of circular piles is more than
that of box piles.
9. For marine pile type of steel tubular piles with reinforced concrete infill, minimum
toe level is often specified in contract drawings. What is its purpose?
The purpose of minimum toe level is two-fold:
(i) In detailed design stage, ground investigation should be conducted and the
approximate level of rockhead is known. Therefore, to avoid the marine piles to be
founded prematurely on boulders, minimum toe levels of marine driven piles are
specified in contract.
(ii) It provides sufficient length of soils for lateral and uplift resistance.
Note: Minimum toe level refers to the minimum level that a marine driven pile should be driven into seabed.
10. What is the problem in traditional marine piling system of steel tubular pile with
concrete infill and what are the possible remedial measures?
In the design of marine piles of steel tubular piles with concrete infill, loads from pier deck
are taken up by steel tubular piles before the occurrence of corrosion of steel piles above
seabed. In fact, it is assumed that steel piles above seabed level will all be corroded after a
certain year. The load transfer mechanism after complete corrosion of steel pile above
seabed is as follows: loads from pier deck are taken up by concrete infill above the seabed
level. Below the seabed level, loads would be transferred to steel piles through frictional
forces between concrete infill and steel casings.
However, substantial radial shrinkage and contraction occurs after concreting of concrete
infill and this will hinder the load transfer from the concrete infill to steel piles because the
bond may be ruptured by radial shrinkage. It is in doubt if frictional forces can be properly
developed in this situation. To solve this problem, shear keys could be installed at regular
spacing inside steel piles to ensure their rigid connection with concrete infill. Alternatively,
expanding agents may be adopted in concrete mixes to ensure that there is no shrinkage
after the concreting process.
11. Why are steel tubular marine piles often driven open-ended?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
40
In marine structures where piles are constantly subject to significant lateral and uplift
forces induced by berthing operation and wave action, it is necessary to drive the piles to
much greater depth. To avoid premature refusal so that insufficient soil cover may develop
which is incapable of providing the required lateral and uplift resistance, tubular piles are
normally driven open-ended so that they are driving to greater depths than piles with closed
ends.
Fig. 5.1 Typical details of marine piles.
12. For typical pile bents in marine piers, how is vertical loads related to horizontal
capacity of the pile bents?
Let’s consider a pile bent with a top slab supported by two ranking piles, each inclining at
an equal angle to the pier slab. In designing such a system, truss action is normally adopted
to analyze the pile bent. When the reaction forces of these piles, horizontal forces (e.g. due
to berthing and deberthing of vessels) and vertical forces (e.g. superimposed deck loads)
are analyzed by drawing a force polygon, it is noted that lateral resistance of the pile bent is
dependent on the vertical load, i.e. lateral resistance is small when vertical loads are high.
Fig. 5.2 Force polygon of pile bent.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
41
13. For underwater concreting, tremie pipes are normally used with the aid of
hoppers. Sometimes tubes are inserted inside the hoppers. Why?
In placing concrete by tremie pipes, hoppers are connected to their top for receiving freshly
placed concrete. However, air may be trapped inside the tremie pipes if there is rapid
feeding of fresh concrete. To release the trapped air inside the tremie pipes, hoses (called
ventilation tubes) are inserted and lowered down through the hoppers. Reference is made to
Carl A. Thoresen (1988).
14. Why is shallow bedrock condition unfavorable for open berth piers?
The most severe load on piers generally is the horizontal load due to berthing of large
vessels. Since the widths of open berth piers are relatively small so that they provides a
short lever arm to counteract the moment induced by berthing loads. Moreover, the dead
load of open berth piers are normally quite light and therefore the resisting moment
provided by the dead load of pier structures may not be sufficient to counteract the moment
generated by berthing loads.
To aid in providing adequate resistance to the overturning moment by the berthing load, the
soil resistance above bedrock contributes to stabilizing moment. For commonly adopted
marine piling type, i.e. driven steel tubular piles with reinforced concrete infill, driven piles
can at most be founded on top of rockhead surface. In case the rockhead level is shallow,
then the little soil cover may result in insufficient lateral resistance to the berthing load.
15. Why are high and narrow beams not desirable in concrete piers?
Based on past experience in other countries (Carl A. Thoresen (1988)), high and narrow
beams after several years of construction showed signs of serious deterioration at the
bottom of the beams. However, the deterioration of pier slabs was not significant when
compared with that of the deep beams. The main reason to account for this is due to the
close proximity of the deep beams to the sea level. To avoid these problems, either
beamless slab or wide with shallow beams are normally designed.
16.What is the mechanism of formation of soil plugs in marine driven steel piles with
reinforced concrete infill?
During initial driving process, open-ended steel piles are driven through the soils at their
bases. However, shaft friction will gradually develop between the steel piles and soils
inside piles at some time after pile driving. The hitting action of driving hammers induces
forces to the soil and later it comes to a stage when the inertial forces of inside soils,
together with the internal frictional forces exceeding the bearing capacity of soils at pile
toes. Consequently, the soil plug formed is brought down by the piles. Reference is made to
M. J. Tomlinson (1977).
Note: A soil plug is a column of soil formed at the bottom portion of marine pile type of steel tubular piles
with reinforced concrete infill.
17. Should stiff or soft fenders be designed for berthing in piers?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
42
The elasticity of fenders is related to the ability to release the stored energy during berthing
of vessels. However, it has no effect on the reaction force and the deflection of fender
system. The amount of energy that a fender can absorb is dependent on the
reaction-deflection curve and is represented by the area under the curve. The higher is the
reaction force, the higher amount of energy would be absorbed by the fender provided that
the resistance of ships’ hull is sufficient to withstand the force without permanent
deformations. Although stiff and soft fender may have the same deflection under the same
maximum reaction force acting on the berthing vessel, the amount of energy absorbed by
stiff fenders is much higher than that of soft fenders. Consequently, stiff fenders should be
employed for berthing purpose.
On the other hand, in mooring operations where vessels are constantly subject to wave
action, it is desirable to keep the tension force on the rope to a low value. In this connection,
it is recommended to use soft fenders.
18. What is the significance of direction of approaching velocities of ships during
berthing operation?
One of the major effects of angle of approaching velocities of ships is its influence of the
energy to be absorbed by the fender system. Consider several ships berth on the same pier
at the same speed but with different angle of approach, though their kinetic energies are the
same, the amount of energy absorbed by fender differs. The amount of energy absorbed by
fender is:
W = 0.5mv2 (k2+r2cos2Φ)/ (k2+r2)
where W= energy absorbed by the fender
m= mass of the ship
v=velocity of the ship
k= radius of gyration of the ship
r= distance of centre of gravity of the ship to the point of contact of the fender
Φ=direction of velocity
Hence, when the direction of approaching velocity of a ship is normal to the fender system
(i.e. =90 ), the amount of energy absorbed is smaller when compared with that of a ship
whose velocity is tangential to the shoreline. Reference is made to F. Vasco Costa (1964).
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
43
Chapter 6 – Roadworks
1. How can unreinforced concrete pavement function without mesh reinforcement?
For concrete carriageway, it is normally classified into two types: reinforced and
unreinforced concrete pavement. The reinforcement in reinforced carriageway (in the form
of mesh) is used for controlling cracking. Then one may query how unreinforced pavement
can control cracking without the use of mesh reinforcement. To answer this question, one
should pay attention to the features of unreinforced concrete pavement. In accordance with
Highways Standard Drawing No. H1109, an approximately 3mm wide groove with a depth
of about one-third to one-fourth of slab thickness is designed with a regular spacing
(normally 5m). The grooves are designed to be too narrow for stones to fall into when the
cracks are open due to concrete contraction. The sectional area in which the groove is
located is a plane of weakness and thus this groove acts a potential crack-inducing device
in which any potential cracks due to shrinkage and thermal contraction may form.
Consequently, the cracks are formed at the base of the groove and thus it would not cause
any unpleasant visual appearance on the exposed surface of unreinforced concrete
pavement.

2. Why are concrete profile barriers designed with curved surface profiles?
Safety fencings are designed to contain vehicles in the carriageway in which they are
traveling and prevent them from rebounding into the road and causing hazards. For normal
fencing design, when vehicles crash into safety fencings, it will give way so as to absorb as
much energy as possible, thus reducing the impact forces on the vehicles. Moreover, it
serves to realign the vehicles along the carriageway when vehicles hit on them. However,
for concrete profile barriers they are not designed to absorb energy during vehicle crashing,
but to hold the vehicles hitting on them. In this connection, concrete profile barriers are
designed with curved profiles so that vehicles can mount and go up partly on them, and yet
they will not cause overturning of vehicles. Reference is made to Arthur Wignall, Peter S.
Kendrick and Roy Ancil.
For shallow-angle crashing of cars, they would climb on the lower slope face of concrete
profile barriers. On the other hand, when a car hits at a large angle to the barrier, the

bumper collides with the upper sloping face of concrete profile barrier and the car rides
upwards. This provides the uplift of the car whose wheels move up the lower sloping face
of the barrier. It is not intended to lift the car too high, otherwise it may result in rolling.
Since the friction between the wheels and barriers provide extra lifting forces, it is
undesirable to design rough finish on these faces. In essence, the kinetic energy of the car
during collision is transformed to potential energy during its lifting up on profile barrier
and finally converted back to kinetic energy when the car returns to the road.
Note: For details of concrete profile barriers, reference is made to HyD Standard Drawing No. H2101A.
3. Should joints of concrete kerbs be in line with the joints in concrete carriageway?
In normal practice, joints are provided in road kerbs to cater for concrete expansion and
contraction. However, the location of joints in kerbs is not arbitrary and they should match
with joints in concrete carriageway. Otherwise, it is very likely that cracks may form in
concrete kerbs at location of pavement joints (Ministry of Transport (1955)).
4. Why is the slump specified in concrete carriageway comparatively low (30mm)
when compared with normal concrete (75mm)?
The slump of concrete carriageway is purposely specified to be a relatively low value, i.e.
30mm. For concrete carriageway, traffic loads directly act on concrete pavement surface
and therefore the surface strength is detrimental to its future performance. In freshly placed
concrete, segregation (may be in the form of bleeding) occurs within the mixture of cement
paste and aggregates. The degree of resistance to segregation is related to workability of
concrete. If substantial segregation is allowed to take place, then the relatively porous and
weak laitance layer will be formed on the carriageway surface and the aggregates will
concentrate in the bottom. Hence, concrete which has insignificant bleed possesses a
stronger surface layer and is more abrasion resistant. Consequently, a small slump value is
specified to increase the wearing resistance of concrete and to achieve a suitable surface
texture of concrete pavements.
Moreover, a low-slump concrete facilitates the use of slipforms when constructing the
concrete pavement. With concrete of a low slump value, it still remains its compacted
shape and is not liable to deform when the paving machines go away. However, if a high
slump concrete is used instead, the pavement surface would drop and the edges may
deform readily.
5. Can all utility detectors detect the depth of utilities?
In Hong Kong, underground utility detectors are normally divided into two types:
electromagnetic detector and ground penetrating radar (GPR).
For electromagnetic detector, it can detect the signals emitted by metallic utilities
themselves by passive mode. While in active mode, the detector has to pick up the signals
through a transmitter and sonda connected directly to the non-metallic utility. Both the
alignment and depth can be found in active mode while only alignment can be found in
passive mode. The electromagnetic detector available in market can detect utilities up to
depth of 3m.

For ground penetrating radar, it sends radio waves into the ground and receives signals
from reflections from utilities. It has the advantage of locating both the depth and
alignment of utilities. More importantly, it can detect both metallic and non-metallic
utilities. However, it suffers from the disadvantage that it is quite expensive and
interpretation of data is not simple. Reference is made to LD, DSD (2000).
6. What is the importance of air void content in bituminous pavements?
The air void content of bituminous materials is an important control parameter for the
quality of bitumen being laid and compacted. If the air void content is too high, it allows
for intrusion of air and water. Moreover, it also increases the rate of hardening of binders
which produce premature embrittlement of pavements. In addition, too high a void content
will also lead to differential compaction subject to traffic loads and result in formation of
ruts and grooves along the wheel track.
However, a minimum amount of air void should be maintained to avoid instability during
compaction process and to provide space for bitumen flow in long-term consolidation
under traffic loads. A sufficient amount of air voids should be designed to make room for
expansion of binder in summer and compaction by road traffic as suggested by National
Association of Australian State Road Authorities (1968), otherwise bleeding and loss of
stability may occur and the pavement will deform readily under severe loads.
7. In concrete pavement, why is the requirement of 95% by mass of quartz grains are
specified in contract?
In General Specification of Civil Engineering Works (1992 Edition), in Clause 10.09 it
states “Fine aggregate for concrete shall be natural river-deposited sand consisting of at
least 95% by mass of quartz grains”. The aim of such specification is to control the quality
of river sand. As quartz is a durable and hard material, using a high percentage of quartz in
aggregates of concrete can enhance the strength and durability of the surface texture of
concrete carriageway.
In addition, such specification requires a high percentage of quartz content, thereby
reducing the probability of presence of impurities like shell.
8. What is the load transfer mechanism for paving blocks in pedestrian footway?
In Hong Kong, footway is normally designed with paving slabs/interlocking blocks instead
of concrete because the extensive use of concrete in pavement is boring. Moreover, poor
appearance will result in concrete pavement due to frequently trench openings for utility
work. In addition, owing to the prolonged setting and curing time of concrete, the use of
concrete pavement inevitably generates disturbance to the general public.
The pedestrian loads are taken up through the following ways:
(i) Load carrying capacity of paving slabs/interlocking blocks are derived from their
individual strength;
(ii) Pedestrian loads are also supported by interlocking forces provided by friction
transfer through the sand in vertical joints (K. K. Tang & Robert P. Cooper (1986)).
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
46
9. What is the function of a sand layer underlying paving slab/interlocking blocks?
Normally after the laying of sub-base layer of the paving slab/interlocking blocks, a 30mm
thick sand bedding is screeded and tamped over the pavement area. Then paving slabs are
laid horizontally with joints of 2-3mm wide and are laid in uphill direction. After
completing the laying of paving slabs, sand used for filling joints is spread over the surface
of the units and brushed into the joints such that all joints are completely filled. The paving
slabs are then bedded into final position by using plate vibrators.
The sand layer serves the same purpose of normal blinding layer under concrete structure:
(i) Provide a level and flat surface for the paving slab/interlocking blocks to lay on;
(ii) Protect the foundation (i.e. underground subgrade and sub-base layer) against adverse
outside conditions (e.g. bad weather) during construction of the laying work of paving
slab/interlocking blocks.
10. What is the function of longitudinal joints in concrete road pavements?
A longitudinal joint consists of a tie bar placed at the mid-depth of a concrete pavement
and it is not intended for joint lateral movement. Then one may doubt the reasons of
placing longitudinal joints in concrete pavements. In fact, longitudinal joints are normally
designed at a regular spacing e.g. 4.5m to accommodate the effect of differential settlement
of pavement foundation. When uneven settlement occurs, the tie bars in longitudinal joints
perform as hinges (Ministry of Transport (1955)) which allow for the settlement of
concrete carriageway. Moreover, it also serves to cater for the effect of warping of concrete
due to moisture and temperature gradients by permission of a small amount of angular
movement to occur so that stresses induced by restrained warping can be avoided.
Dowel bars are provided in longitudinal joints for the following reasons:
(i) In case of the occurrence of uneven settlement between adjacent panels, it helps to
maintain a level surface by transfer of loads through dowel bars.
(ii) Keep the longitudinal joints close.
11. For rigid pavement, what are the advantages of using lean concrete sub-base
instead of traditional granular sub-base?
There are several shortcomings of using granular sub-base in concrete carriageway:
(i) Since sub-base is permeable, water can seep through sub-base and soil particles will
be pumped out through contraction/expansion joints when subject to traffic load.
Consequently, voids are formed underneath the pavement structure and the concrete
pavement may crack under severe traffic loading.
(ii) Lean concrete increases the strength and renders the roads capable of carrying heavy
traffic loads (David Croney and Paul Croney (1992)).
(iii) Due to workmanship problem, it may have uneven distribution of sub-base and this
results in cracking of concrete carriageway when subject to severe traffic loading.

13. If the construction of concrete carriageway is carried out in summer, can
expansion joints be omitted?
If the construction of concrete carriageway is carried out in summer, expansion joints may
not be necessary as suggested by Arthur Wignall, Peter S. Kendrick and Roy Ancil.
Expansion of concrete carriageway is mainly due to seasonal changes with an increase in
temperature from that during construction to the ambient temperature (i.e. the temperature
in summer). However, if the construction of concrete carriageway takes place in summer,
the concrete carriageway will undergo contraction in the following winter, thus the space
available in contraction joints can accommodate the future expansion in the next summer.
14. If there is a delay of bituminous laying on top of sub-base, should tack coat be
applied on the top surface of sub-base?
When there is a delay between bituminous laying of different bituminous layers (i.e.
roadbase, base course etc.), a tack coat is applied on top of the bituminous layers because it
helps to enhance better bonding between bituminous materials. If there is insufficient
bonding between adjacent bituminous layers, they behave as separate independent layers
which can hardly resist the traffic loads. When applying the tack coat, it should be sprayed
uniformly on the bituminous surface and allowed for sufficient curing. The hot bituminous
material laid on top of the coat would soften it, enabling the tack coat to partly fill voids in
the bituminous materials. For emulsified asphalt type tack coats, they are normally diluted
with water in order to achieve a more uniform application without excessive usage of
asphalt. After the subsequent compaction is carried out, the coat would be interlocked with
the bituminous materials. On the other hand, care should be taken to ensure that excessive
coat would not be laid, otherwise slippage or shear cracks in the bituminous material would
occur due to the relative thick layer of the tack coat applied.
However, for sub-base surface, priming coat instead of tack coat may be applied in the
event of a delay in laying of bituminous layer on top of the sub-base layer. The function of
the primer serves to maintain the existing surface condition for a longer period and it also
provides an impermeable surface to prevent ingress of water or water loss by evaporation.
Moreover, it fills the surface voids and protects the sub-base from adverse weather
conditions. In addition, it also helps to promote adhesion between adjacent road layers and
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
48
to harden the surface.
15. What is difference in purpose for conducting surface regularity test and sand
patch test (test on texture depth)?
The purpose of surface regularity test is to measure the riding quality of pavements and the
same requirement and standard is applied to both concrete and bituminous carriageway. On
the other hand, sand patch test is used for checking the skid resistance of road pavements.
Moreover, it is related to traffic noise because the intensity of noise generated from road
traffic is related to texture depth of carriageway.
16. In General Specification for Civil Engineering Works (1992 Edition), it specifies
the temperature requirements for bituminous material during and after mixing. What
is the reason behind this?
Temperature is one of the factors that govern the compaction of bituminous material and
the air void content is found to decrease with an increase in compaction temperature. This
phenomenon is explained by the viscosity-temperature relations: the higher is the viscosity
of binders, the greater is the resistance to compaction. Therefore, in normal contract for
bituminous laying, the temperature requirements for bituminous material during and after
mixing are specified.
17. Can a sub-base layer serve as a drainage layer to remove water from pavement?
Besides providing load distribution in post-construction stage and working platform in
construction stage, sub-base can also serve as a drainage layer to remove water coming
from the pavement. For thick layers of road pavement, it is likely that the water leakage
from pavement is insignificant and therefore the sub-base layer mainly serves to support
the traffic stresses. However, for thin pavement layers, water penetration is quite
substantial and therefore sub-base may also act as a drainage layer to remove these water.
18. For unreinforced concrete carriageway, what is the sequence of closing and
opening of expansion joints and contraction joints?
Let’s take an example to illustrate the sequence of closing and opening of joints (Ministry
of Transport (1955)). For instance, an unreinforced concrete carriageway is constructed in
winter. When temperature rises in the following summer, the section between expansion
joints will expand as a whole single element resulting in the closure of expansion joints.
This section of concrete pavement will move outwards from the mid-point between the
expansion joints. In the next winter, each bay (i.e. concrete pavement between adjacent
contraction joints) of concrete contracts about the midpoint of its length with opening of
contraction joints.

19. Are kerbs necessary in road pavements?
In general, kerbs are essential in road pavements due to the following reasons (based on
Arthur Wignall, Peter S. Kendrick and Roy Ancil):
(i) They provide strength to the sides of road pavements and avoid lateral displacement of
carriageway due to traffic loads.
(ii) In terms of road safety, they serve as a separation line between footway and
carriageway and aid car drivers in driving safely.
(iii)They act as a vertical barrier to guide the surface runoff collected in road pavements to
the gullies.
Fig. 6.3
20.What are the design considerations for dowel bars in joints of concrete
carriageway?
The behaviour of dowel bars resembles that of piles in soils subject to lateral loads. Failure
of the joint occurs by yielding of steel under bending action or by crushing of concrete due
to bearing stresses.

In general, the spacing of dowel bars should not be too close which may pose problems
during construction. However, it should be not too wide to allow the occurrence of bending
between the dowel bars. On the other hand, regarding the length of dowel bars, it should
not be too long because the induced stress at the end of long dowel bars is insignificant and
is not effective in transferring loads between adjacent concrete panels. However, if the
dowel bars are too short, the stress at the face of joint is increased resulting in concrete
crushing. Reference is made to Ministry of Transport (1955).
21. What is the function of a separation membrane between concrete pavement slab
and sub-base?
The separation membrane between concrete pavement slab and sub-base has the following
functions:
(i) It aids in reducing the frictional forces between concrete slab and sub-base and helps to
movement of concrete slab with respect to sub-base owing to changes in temperature
and moisture.
(ii) It prevents the loss of cement and water in immature concrete which significantly
affects the strength and durability of hardened concrete.
(iii)It avoids the mixing up of sub-base materials and freshly placed concrete.
Polythene sheeting, which is a waterproof material, is commonly used as separation
membrane.
22. Should emulsified asphalts or cutback asphalts be selected as tack coat in
bituminous roadworks?
Emulsified asphalt is a suspension of asphalt in water by using an emulsifying agent which
imposes an electric charge on asphalt particles so that they would be join and cement
together. On the other hand, cutback asphalt is simply asphalt dissolved in petroleum. The
purpose of adding emulsifying agent in water or petroleum is to reduce viscosity of asphalt
in low temperatures.
The colour of emulsion for tack coat is brown initially during the time of application. Later,
the colour is changed to black when the asphalt starts to stick to the surrounding and it is
described as “break”. Finally, when water has all evaporated, the emulsion is said to have
“set”. Similarly, for cutback emulsion, it is described to “cure” when the solvent has
evaporated. However, there are several problems associated with cutback asphalts:
(i) Emulsified asphalt can be diluted with water so that a low application rate could be
achieved.
(ii) The evaporation of petroleum into atmosphere for cutback asphalt poses environmental
problem.
The cost of production of petroleum is higher than that of emulsifying agent and water.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
51
Chapter 7 – Pumping Station
1. What is the difference among cement plaster, cement render and cement screed?
Under what situations should each of the above be used?
The purpose of plastering, rendering and screeding is to create a smooth, flat surface to
receive finishes like paint, wallpaper etc.
Plastering is the intermediately coating of building materials to be applied on the internal
facade of concrete walls or blockwalls.
Rendering is the intermediate coating for external walls only.
Screeding is the coating laid on floors to receive finishes like tiles, carpet, and marble...
Hence, these terms differ basically from the locations at which they are applied. Due to
different locations of application of plasterwork, the proportion of material component for
plaster and render is different. For example:
(i) Cement plaster
Undercoat- cement:lime:sand (by volume) = 1:4:16
Finishing coat - cement:lime:sand = 1:12:30
(ii) Cement render
Undercoat- cement:lime:sand (by volume) = 1:2:6
Finishing coat - cement:lime:sand = 1:3:6
2. In the design of corbel beams in a pumping station, why are shear links designed in
the top 2/3 of the section?
What is the general advice on the design?
Corbel beams are defined as z/d<0.6 where z is the distance of bearing load to the beams’
fixed end (or called shear span) and d is depth of beams. The design philosophy is based on
strut and tie system. To establish the design model, it is firstly assumed the failure surface,
i.e. shear cracks extending to 2/3 of depth of beam. Experiment results verified that the
failure cracks extended only to 2/3 of beam while the remaining 1/3 depth of concrete
contributed as concrete strut to provide compressive strut force to the bearing loading.
Horizontal links are normally provided to corbel beams because experimental results
indicated that horizontal links were more effective than vertical links when shear
span/depth is less than 0.6. For shear span/depth>0.6, it should be not considered as corbel
beams but as cantilevers.
In designing corbel beams, care should be taken to avoid bearing load to extend beyond the
straight portion of tie bars, otherwise the corners of corbel beams are likely to shear off.
Reference is made to L. A. Clark (1983).
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
52
3. Given a 1m high staircase resting on solid concrete, would it be adequate to design
nominal reinforcement for the staircase?
For the design of staircase, there are three main scenarios:
(i) Stairs spans longitudinally
This kind of stairs refers to stairs spanning between landings only without any side
supports. In this case, the staircase should be designed as a beam between two end supports
(i.e. landing) and the main reinforcement is provided at the bottom of staircase slabs.
(ii) Stairs spanning transversely
This kind of staircase is supported by sidewalls only and it may also be supported by
stringer beams. For the case of sidewalls, it acts as a cantilever beam and the main
reinforcement are provided the top surface of slab. For the case of staircase supported
sideways by both sidewall and stringer beam, it should be designed transversely with end
supports as sidewall and stringer beam and reinforcement is provided at the bottom of the
staircase.
(iii) Stairs resting on solid support
For stairs resting on solid supports, only nominal steel reinforcement is provided to control
thermal and shrinkage cracking.
4. In selecting screw pumps in polder scheme projects, what are the factors that affect
the design capacity of screw pumps?
The commonly used angles of inclination for screw pumps are 30o, 35o and 38o. For screw
pumps of relatively high lifting head, like over 6.5m, angle of inclination of 38o is normally
used. However, for relatively lower head and high discharge requirement, angle of
inclination of 30o shall be selected. In general, for a given capacity and lifting head, the
screw pump diameter is smaller and its length is longer for a screw pump of 30o inclination
when compared with a screw pump of 38o inclination.
To increase the discharge capacity of screw pumps, a larger number of flights should be
selected. In fact, screw pumps with 2 flights are more economical that that with 3 flights in
terms of efficiency and manufacturing cost. Moreover, the discharge capacity is also

determined by the screw pump diameter and sizes of 300mm to 5000mm are available in
current market.
5. What are the components of a waterproofing system in the roof of a typical
pumping station?
In the design of a waterproofing system at the roof of a pumping station, normally the
following components are:
(i) Above the structural finish level of the concrete roof, a screed of uniform thickness is
applied to provide a smooth surface for the application of waterproofing membrane.
(Screed of varying thickness can also be designed on the roof to create a slope for
drainage.) The screed used for providing a surface for membrane should be thin and
possess good adhesion to the substrate. Moreover, the screed aids in the thermal
insulation of the roof.
(ii) Above the screed, waterproofing membrane is provided to ensure watertightness of
the roof.
(iii) An insulation board may be placed on top of waterproof membrane for thermal
insulation. In cold weather condition where the loss of heat at the roof is significant,
the insulation board helps to reduce these losses. On the contrary, in summer the roof
is heated up by direct sunlight and the insulation layer reduces the temperature rise
inside the pumping station.
6. In pumping stations one of the choices for the material of water tanks is
fibre-reinforced plastic (FRP). What are the advantages associated with this kind of
material?
There are two main advantages for FRP water tanks:
(i) It possesses high strength to weight ratio and this leads to the ease of site handling.
(ii) It is highly resistant to corrosion and thus it is more durable than steel water tank.
7. In the construction of pump troughs for accommodation of screw pumps, what is
the construction method to ensure close contact between the screw pumps and the
pump trough?
In the construction of screw pump troughs, trapezoidal-shaped troughs are usually formed
by using normal formwork. In order to enhance close contact between screw pumps and
troughs, upon lifting the screw pumps into the troughs screeding works is carried out.
Screw pumps are set to rotate and screeds are placed between the gap of screw pumps’
blade and trapezoidal-shaped troughs during the rotating action of screw pumps. After the
screed sets, it serves to prevent leakage of water during the pumping operation of screw
pumps.
8. Why are voids filled with lightweight infilling material in raft foundation of
pumping stations?
To reduce the dead load and hence to reduce the settlement of pumping stations, the voids
inside the raft foundations are filled with light material. If instead concrete is placed inside
these voids, it poses severe thermal cracking problem and drastically increases loads to

pumping stations. The use of general fill is also not desirable because its self-weight is
comparable to that of concrete. On the contrary, if these voids are left vacant, water may
penetrate into these voids during future operation and increases the dead load of pumping
stations during its normal operation. Therefore, lightweight infill material, which is
non-water-absorbing and non-biodegradable, is designed inside these voids to avoid ingress
of water and to reduce the dead load of the structure.
9. What is the difference in arranging pumps in series and in parallel?
For identical pumps with similar functions, if the pumps arranged in series, the total head is
increased without a change to maximum discharge. On the other hand, for pumps arranged
in parallel to one another, the discharge is increased without any changes to maximum
head.
10. In terms of pumping performance, how should engineers determine the use of
radial flow pumps and axial flow pumps?
Specific speed is usually defined for a pump operating at its maximum efficiency. In order
to minimize the cost of future operation, it is desirable to operate the pumps as close to the
maximum efficiency point as possible. The specific speed for radial flow pumps is
relatively small when compared with that of axial flow pumps. This implies that radial flow
pumps tend to give higher head with lower discharge while axial flow pumps tend to give
higher discharge with lower head.

Chapter 8 – Reclamation
1. What are different approaches for reclamation in deep water region and shallow
water region?
To illustrate the different approaches adopted for reclamation in deep water and shallow
water region, the following example is used:
In deepwater region, consider the seabed level is –8.5mPD. After laying of geotextiles and
1.5m thick sand blanket, the top level of sand blanket is about –7mPD. Split barges are
deployed for dumping public fill to –2.5mPD. Afterwards, end dipping of public fill by
trucks will be carried out up to +2.5mPD which is the designed reclamation level. Between
level –2.5mPD and +2.5mPD, it is too shallow for split barges to enter the water, thus the
method of end dipping is used instead.
For shallow water region, the seabed level is taken as –5.5mPD in this example. With the
laying of geotextiles and 1.5m sand blanket into position, the top level of sand blanket is
about –4mPD. In this case, split barges are also used for reclamation work between the
level –4mPD and –2.5mPD. After that, if end dipping is used for reclamation work
above –2.5mPD, then in considering the relative thin layer of fill above seabed (1.5m sand
blanket + 1.5m sand blanket), it stands a high chance that mud wave would occur in seabed.
Therefore, half-loaded derrick barges are employed for reclamation up to level 0mPD.
With a thicker layer of public fill now, end dipping can then be used for reclamation
between 0mPD and +2.5mPD.
This above reclamation sequence is just an example to demonstrate the different
considerations for reclamation in deep water and shallow water region.
2. In case mud waves occur during reclamation, what are the possible solutions to
rectify the situation?
(i) Option 1 – Complete Removal of All Disturbed Mud
To remove all disturbed mud once mud waves occur is the fastest way to treat the problem.
After that, filling material is used for replacing the disturbed mud. However, this option is a
rather expensive option because it involves dredging of all disturbed mud and replacement
of large amount of fill.
(ii) Option 2 – Accelerated consolidation of Disturbed Mud
This option involves placement of surcharging loads on top of mud waves, together with
installation of band drains to accelerate the consolidation of disturbed mud. This method
suffers from the drawback that sufficient long time is required for the consolidation process
of mud.
(iii) Option 3 – Partial Removal of Disturbed Mud
This option is a combination of the first two options in which the top weak layer of mud is
removed while the lower mud is treated with surcharging with band drain installation.
Note: Mud waves refer to excessive displacement of mud due to successive slip failure during reclamation.
3. What is the importance of geotextiles and sand in reclamation works?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
56
For geotextiles used in reclamation, they serve mainly the following two purposes:
(i) they separate reclamation fill from marine mud;
(ii) they may act as reinforcement to enhance the stability of reclamation. However, the
reinforcement function is still under heated debate because its performance as
reinforcement depends on several factors like the directional strength of woven
geotextiles and damage effect by installation of vertical band drains.
For sand:
(i) it spreads the load of future public dump on top of it;
(ii) it acts as drainage path for dissipation of excess pore water pressure for band drain
installation.
4. Geotechnical Instrumentation is frequently employed for monitoring the condition
of reclamation. Sometimes two piezometers are installed inside the same borehole.
What is the reason behind this?
For standpipes, they normally contain one plastic tube between its intention is to measure
water level only. However, for piezometers, they are used for measuring pore water
pressure in a certain depth below ground. For instance, if there are two clayey layers below
ground at different depths, a multiple piezometer including two separate piezometers may
be sunk at the same borehole to determine the pore water pressure at these layers
respectively. This arrangement has the advantage that it saves the cost of installation of
separate boreholes for several piezometers. However, the installation of multiple
piezometers within the same borehole is affected by occurrence of leakage along the pipes
as suggested by Marius Tremblay (1989).
5. What is the difference between standpipe, standpipe piezometer and piezometer?
A standpipe normally contains plastic pipes with perforated holes at the base. The annular
space between the perforated tube and casing is filled with gravel or sand backfill. Under
such an arrangement, standpipe is used to measure water level of a certain region.
A standpipe piezometer is a type of piezometer which measures pore water pressure at a
certain level. It consists of plastic pipes without holes. The tip of the standpipe piezometer
is perforated and the annular space between the tip of the piezometer and soil is filled with
sand while the annular space between other parts of plastic tube and soil is filled with
cement/bentonite grout to seal off water from entering the region of piezometer tip. This
enables the pore water pressure in the region of piezometer tip to be measured. In essence,
standpipe piezometers are installed to study the pore water pressure of a specified depth
below ground. However, it suffers from the disadvantage that the response time is relatively
slow in clayey soils. Reference is made to Marius Tremblay (1989).
6. For drained reclamation, what is the significance of smear zone induced by
installation of band drains?
During installation of band drains, smear zones are created in which a zone of soil
surrounding the band drains are disturbed. The compressibility of surrounding soils is
increased and it results in the reduction of their permeability. In fact, the surrounding soils
are remoulded during the installation process and the effectiveness of band drains is
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
57
reduced. In essence, for the reduced permeability of soils around band drains, it takes
longer time to complete the consolidation process.
7. In case a road passes through a reclaimed land and an existing land, what is the
main concern regarding the design of pavements?
For an existing land, it is anticipated that there will be no major settlement within the
design life of pavement structures. However, for a recently reclaimed land, even with
surcharging and installation of vertical drains, some settlement will still occur after the
construction. If a road pavement has to be constructed connecting these two areas, special
design has to be made in this transition region. In order to avoid the occurrence of
differential settlement which may damage the pavement structure, a transition slab may be
designed to accommodate such movement (J. S. M. Kwong (1996)).
8. In dredged reclamation, what are the considerations in selecting between trailer
suction hopper dredgers and grab dredgers?
Trailer suction hopper dredgers are vessels which remove material off the seabed through
hydraulic suction by using pumps. During the dredging operation, a mixture of soil and
water is transported through suction pipe to storage hoppers. Significant turbulence inside
the hoppers keeps the dredged mixture in suspension and this should be minimized to
enhance the material to settle swiftly prior to the process of overflowing. Trailer suction
hopper dredgers are mounted with draghead or dragarm pumps which increases the
dredging depth and trims down the occurrence of cavitation as suggested by John B.
Herbioh (1992). This machine is limited to dredging relatively low-strength material.
Moreover, they cannot be deployed in very shallow waters and instead grab dredgers
should be used. However, its dredging capacity is higher than that of grab dredger and it
can be mobilized in relatively deep-water region.
Trailer suction hopper dredgers are renowned for their mobility, versatility and capability to
operate in unfavorable sea conditions.
9. What are the considerations in selecting marine plants and land plants for
installation of band drains?
For installation of band drains by marine plants, it must have sufficient water depth to
accommodate the marine plants in the first place. However, due to the effect of tides and
waves, the establishment of the position for installation of band drains and the subsequent
installation works may be affected. In addition, the establishment cost of marine plants is
higher than that of land plants.
For installation of band drains by land plants, difficulty may be encountered during the
installation of band drains through the reclaimed layer e.g. C&D material. Land plants may
take longer construction time due to the above-mentioned difficulty. Sometimes when the
supply of public fill is increased suddenly, it may be preferable to place these fill
immediately into position and in this situation the installation of band drains (originally
installed by marine plants) is delayed so that the construction of band drains is changed to
using land plants.
10. For installation of silt curtains, why is it not desirable to design the curtain to

touch the seabed?
Silt curtains are impermeable vertical barriers extending from the seawater surface to its
designed depth. The curtains are held in a vertical position by the carrier float on their top
and a curtain weight at their bottom. A tension cable is designed at the carrier float to resist
stresses incurred by currents. Moreover, the silt curtains are anchored to the seabed to hold
them in the designed configuration.
In essence, the depth of silt curtains should not be so long and touch the seabed because the
bottom segment of the silt curtains would be trapped inside the newly accumulated
sediment, thus resulting in sinking of the curtain. Consequently, it is difficult to remove
these sunken curtains. Moreover, reversal tidal and current actions may cause the
movement of bottom region of curtains which stir up the settled suspensions and induce
additional turbidity.
11. What are the functions of slip joints in blockwork seawalls?
Slip joints are joints which are formed through a complete vertical plane from the cope
level to the toe level of seawalls. These joints are designed in blockwork seawalls to cater
for possible differential settlements between adjacent panels of seawalls. The aggregates
inside the half-round channels in slip joints allow for the vertical movements induced by
differential settlement and at the same time providing aggregate interlocking forces among
adjacent panels of seawalls to link the panels in one unit against the lateral earth pressure
exerted on seawall.
Besides, slip joints provide a path for the relief of water pressure developed and allow the
lateral movement (e.g. contraction) due to seasonal variations.
Note: For details of slip joints, reference is made to CEDD Standard Drawing No. C3008C.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
59
Chapter 9 – Water Retaining Structure and Waterworks
1. When designing a water storage tank, should movement joints be installed?
In designing water storage tanks, movement joints can be installed in parallel with steel
reinforcement. To control the movement of concrete due to seasonal variation of
temperature, hydration temperature drop and shrinkage etc. two principal methods in
design are used: to design closely spaced steel reinforcement to shorten the spacing of
cracks, thereby reducing the crack width of cracks; or to introduce movement joints to
allow a portion of movement to occur in the joints.
Let’s take an example to illustrate this. For 30m long tanks wall, for a seasonal variation of
35 degree plus the hydration temperature of 30oC, the amount of cracking is about 8.8mm.
It can either be reduced to 0.3mm with close spacing or can be absorbed by movement
joints. Anyway, the thermal movement associated with the seasonal variation of 35oC is
commonly accounted for by movement joints.
For water-retaining structure like pumping stations, the crack width requirement is even
more stringent in which 0.2mm for severe and very severe exposure is specified in BS8007.
It turns out to a difficult problem to designers who may choose to design a heavy
reinforced structure. Obviously, a better choice other than provision of bulky reinforcement
is to allow contraction movement by using the method of movement joints together with
sufficient amount of reinforcement. For instance, service reservoirs in Water Supplies
Department comprise grids of movement joints like expansion joints and contraction joints.
2. What is the crack pattern induced by hydration due to internal restraint?
Let’s take a circular column as an example to illustrate this.
When the temperature is rising, the inner concrete’s temperature is higher than outer
concrete’s temperature and the inner concrete is expanding. This induces pressure to the
outside and the induced compressive stress will result in formation of radial cracks near the
surface of concrete.
When the temperature drops, the concrete at the outside drops to surrounding temperature
while the concrete at the central region continues to cool down. The contraction associated
with inner concrete induces tensile strains and forms cracks tangential to the circular
radius.
3.What is the purpose of adding cooling pipes or even using cold water for concrete in
concreting operation?
All these measures aim at reducing the placing temperature and reducing thermal cracks
induced during concreting of massive pours. Since the final concreting temperature should
be the ambient temperature, reducing the initial placing temperature will also lower the
peak hydration temperature. Therefore, the temperature difference between the hydration
peak and the ambient temperature is reduced accordingly and subsequently the thermal
effect to concrete structure can be reduced by controlling the placing temperature.
4. Is the material of formwork (timber or steel) helps to reduce thermal cracks in
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
60
concreting operation?
To answer this question, one must fully understand the effect of formwork on the
temperature of concreting structure. Without doubt, with better insulation of structure by
timber formwork, the overall rise of temperature and hence the peak hydration temperature
is also increased. However, for a well-insulated structure, the temperature gradient across
concrete element is reduced. Therefore, the use of well-insulated formwork (like timber)
increases the maximum temperature and reduces the temperature gradient across the
structure at the same time. Hence, whether steel or timber formwork should be used to
control thermal cracking is dependent on the restraints and the size of section.
If the section under consideration is thick and internal restraint is the likely cause to
thermal cracking, then timber formwork should be used. On the other hand, if external
restraint is the main concern for thermal cracking, then steel formwork should be used
instead.
5. What is the importance of critical steel ratio in calculating thermal reinforcement?
The fulfillment of critical steel ratio means that in construction joints or planes of weakness
of concrete structure, steel reinforcement will not yield and concrete fails in tension first.
This is important in ensuring formation of more cracks by failure of concrete in tension,
otherwise failure in steel reinforcement would produce a few wide cracks which is
undesirable.
6. In selection of waterstop, shall engineers use plain dumb-bell type or center-bulb
type?
The plain dumb-bell type is used for joint location where small movements are anticipated.
Therefore, construction joints are desirable locations of this type of waterstop. On the other
hand, center-bulb type waterstop is suitable for expansion joints or locations where lateral
and shear movements occur due to settlement or deflection. Reference is made to W. L.
Monks (1972).
7. Why do BS8007 specify the allowable crack width of water retaining structure as
0.2mm for severe or very severe exposure?
For crack width less than 0.2mm, it is assumed that the mechanism of autogenous healing
will take place in which the crack will automatically seal up and this would not cause the
problem of leakage and reinforcement corrosion in water retaining structure.
When the cracks are in inactive state where no movement takes places, autogenous healing
occurs in the presence of water. However, when there is a continuous flow of water through
these cracks, autogenous healing would not take place because the flow removes the lime.
One of the mechanisms of autogenous healing is that calcium hydroxide (generated from
the hydration of tricalcium silicate and dicalcium silicate) in concrete cement reacts with
carbon dioxide in the atmosphere, resulting in the formation of calcium carbonate crystals.
Gradually these crystals accumulate and grow in these tiny cracks and form bonding so that
the cracks are sealed. Since the first documented discovery of autogenous healing by the
French Academy of Science in 1836, there have been numerous previous proofs that cracks
are sealed up naturally by autogenous healing. Because of its self-sealing property,

designers normally limit crack width to 0.2mm for water retaining structures.
8. In designing reservoirs, the indirect tensile strength of the concrete mix is specified
to be less than a specific value (e.g. 2.8N/mm2) for potable water. Why should
engineers put an upper limit of indirect tensile strength?
The crack width formation is dependent on the early tensile strength of concrete. The
principle of critical steel ratio also applies in this situation. The amount of reinforcement
required to control early thermal and shrinkage movement is determined by the capability
of reinforcement to induce cracks on concrete structures. If an upper limit is set on the early
tensile strength of immature concrete, then a range of tiny cracks would be formed by
failing in concrete tension. However, if the strength of reinforcement is lower than
immature concrete, then the subsequent yielding of reinforcement will produce isolated and
wide cracks which is undesirable for water-retaining structures. Therefore, in order to
control the formation of such wide crack widths, the concrete mix is specified to have an
indirect tensile strength at 7 days not exceeding a certain value (e.g. 2.8N/mm2 for potable
water). Reference is made to R. D. Anchor, A.W. Hill and B. P. Hughes (1979).
9. Shall reversible moisture movement be taken into account in estimating movement
for movement joints?
The size of concrete is affected by changes in atmospheric humidity: moisture causes
expansion while drying causes shrinkage. Such moisture movement is reversible. This is
totally different from drying shrinkage in which concrete slowly loses moisture during
hardening, thus causing irreversible shrinkage.
In fact, the variation of humidity and the estimated reversible moisture movement is not
significant (about 30%) and therefore, its contribution to movement does not justify for
movement joints as suggested by MN Bussell & R Cather (1995).
10. In the design of watermains, how to decide the usage of double air valves and
single air valves?
Single air valves allow squeezing air out of the pipeline in automatic mode in high-pressure
condition and are normally designed in high points of watermain in which air voids are
present. Double air valves basically serve the same purpose except that it has another
important function: it can get air into/out of the pipeline during low-pressure condition.
In WSD practice, watermain are normally divided into sections by installation of sectional
valves to facilitate maintenance. In a single isolated pipeline section bounded by two
sectional valves, at least a double air valve should be installed. During normal maintenance
operation like cleansing of watermain, water inside pipelines is drawn from washout valves.
However, as normal watermain is subject to very high pressure like 1.5MPa and the sudden
withdrawn of water will cause a transient vacuum condition and will damage the watermain.
Therefore at least one double air valve should be present to allow air to squeeze in to
balance the pressure and this protects the pipeline from damaging.
In essence, for local high points single air valves should be installed. Within a section of
pipeline, at least one double air valve should be installed.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
62
11. Why are two gate valves required in normal practice to form a washout valve?
In fact, the situation is analogous to that of fire hydrants in which two gates valves are
installed with a single fire hydrant. Washout valves are used for normal maintenance work
of watermain like allowing flowing out of water during cleaning of watermain. At the
junction where a tee-branch out to a washout point, a gate valve is installed to separate the
two pipelines. However, this gate valve is open during normal operation while another gate
valve further downstream is installed (closed during normal operation). If the downstream
gate valve is not installed in position, then the pipe section of branched-out watermain will
be left dry during normal operation and there is a high probability that damage to
watermain and frequent leakage would occur. With the downstream gate valve installed,
the segment of branched-out watermain contains water in normal operation. In case there is
any leakage, it can be readily detected by using the two gate valves.
12. After the construction of watermain, prior to hydrostatic pressure test, swabbing
is carried out. What is the purpose of swabbing?
Pipelines should be tested before commissioning to check the strength of watermain and
the absence of leak. Before carrying out hydrostatic pressure test, swabbing is conducted to
clear out rubbish and dirt left inside the pipeline during construction. Swabbing is required
for pipes less than 600mm diameter because for larger size of pipes, they can be inspected
internally to ensure cleanliness.
After carrying out of hydrostatic pressure test, test for water sterilization is then conducted
which involves collecting water sample from the pipeline. The purpose is to check the
water quality like colour, turbidity, odor, pH value, conductivity etc. and is compared with
the quality of water drawn from water supply point.
13. In the design of watermain, the normal practice is to use ductile iron for pipe size
less than 600mm and to use steel for pipe size more than 600mm. Why?
For watermain pipe size less than 600mm, ductile iron is normally used because internal
welding for steel pipes below 600mm is difficult to be carried out. Moreover, it requires
only simple jointing details which allow for faster rate of construction. For watermain pipe
size above 600mm, steel pipes are recommended because steel pipes are lighter than ductile
iron pipes for the same material strength and therefore the cost of steel pipes is less than
that of ductile iron pipes. In addition, in areas of difficult access the lighter mild steel pipes
pose an advantage over ductile iron pipes for easy handling.
14. In the design of service reservoirs, horizontal reinforcement in walls of reservoirs
is placed at the outer layer. Why?
Since service reservoirs are designed as water-retaining structures with stringent
requirement of crack width control, the design of reinforcement of service reservoirs is
under the control of serviceability limit state. For the walls of service reservoirs,
contraction and expansion of concrete are more significant in the horizontal direction of
walls because of their relatively long lengths when compared with heights. In this
connection, in order to minimize the usage of reinforcement, horizontal bars are placed at
the outmost layer so that the distance of reinforcement bars to concrete surface is reduced.
Since the shorter is the distance to the point of concern, the smaller is the crack width and

hence with such reinforcement arrangement advantages are taken if the reinforcement bars
in the critical direction are placed closest to concrete surface.
15. In the design of service reservoirs, how are reservoir floors designed to prevent
leakage of water due to seasonal and shrinkage movements?
There are in general two main approaches in designing floors of service reservoirs:
(i) In the first method, movement joints are designed in each panel of reservoir floors so
that they can expand and contract freely. Each panel is completely isolated from one
another and a sliding layer is placed beneath them to aid in sliding.
(ii) The second method, on the contrary, does not make provision to free movement. Due
to seasonal and shrinkage movements, cracks are designed to occur in the reservoir
floors such that very tiny cracks are spread over the floor and these cracks are too
small to initiate corrosion or leakage. However, in this case, the amount of
reinforcement used is much larger than the first approach.
16. What is the difference between air chamber and surge tank?
Air chambers and surge tanks are normally installed in watermain to ease the stress on the
system when valves or pumps suddenly start up and shut down. A surge tank is a chamber
containing fluid which is in direct contact with the atmosphere. For positive surge, the tank
can store excess water, thus preventing the water pipes from expansion and water from
compression. In case of downsurge, the surge tank could supply fluid to prevent the
formation of vapour column separation. However, if the surge pressure to be relieved is
very large, the height of surge tank has to be designed to be excessively large and
sometimes it is not cost-effective to build such a chamber. On the contrary, a air chamber
can be adopted in this case because air chamber is a enclosed chamber with pressurized
gases inside. The pressure head of gas inside the air chamber is the component to combat
the hydraulic transient. However, air chamber has the demerits that regular maintenance
has to be carried out and proper design of pressure level of gas has to be conducted.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
64
Chapter 10 – Pipe Jacking and Microtunneling
1. In the design of pipe jacking, what particular areas on pipe joints should engineers
take care of?
Since in pipe jacking, the jacked pipes could hardly be jacked in the designed level and
alignment and some deviation from the original one is commonly acceptable provided that
the deviation are within the tolerance of the Contract. However, in order to avoid damage
made to the pipe joints due to overstressing, it is necessary to estimate the stress
concentrations resulting from these angular deflections.
Note: Pipe jacking is a trenchless method in which pipes are jacked underground from jacking pits and
receiving pits.
2. What are the differences in design between normal precast concrete pipes and pipes
used for pipe jacking?
For pipes used for pipe jacking, they should possess the following characteristics:
(i) Pipes should have high concrete strength to withstand the stress induced during the
jacking process.
(ii) There is tight tolerance in pipe dimension and the pipe joints are specially designed to
provide trouble-free joint details. Two commonly available joints are rebated joint
and butt end joint.
(iii) Pipes preferably should have smooth external concrete finishes to reduce the friction
between the pipes and surrounding soil.
3. Why are intermediate jacks designed in some pipe jacking projects?
When the process of pipe jacking stops, building up of resistance is very fast in some soil.
For instance, increase in jacking force of 20%-40% is required for a stoppage of pipe
jacking for just several hours. Hence, it is recommended that pipe jacking should be carried
out in a continuous operation.
For a long pipeline, the frictional forces established between the jacking pipes and soil is
high. Sometimes, such resisting forces may be so high that they can hardly be overcome by
the jacks in jacking pits. Moreover, even if the jacks can overcome the high frictional
forces induced during jacking, high loads are experienced in jacking pipes during driving.
Jacking pipe’s material e.g. concrete may not have sufficient strength to resist these
stresses and hence pipe strength is another factor that govern the need for consideration of
using intermediate jacks.
4. What is the function of packing materials in the joint of concrete pipes in pipe
jacking?
Packing materials are about 10mm to 20mm thick and are normally made of plywood,
fibreboard or other materials. In case packing materials are absent in pipe joints for pipe
jacking, then any deflection in the joints reduces the contact area of the concrete and it
leads to spalling of joints due to high stresses induced. With the insertion of packing
material inside the pipe joints, the allowable deflection without damaging the joint during

the pipe jacking process can be increased.
5. In pipe jacking/microtunneling, it is commonly accepted that cover depths of
jacking pipes cannot be too shallow (i.e. less than 2D where D is the diameter of
jacking pipes). Why?
For pipe jacking/microtunneling, the causes of large settlement are loss of face stability,
failure to stabilize ground around shafts, presence of annular space around pipes and shield,
drag along pipe joints, etc. The settlement mechanism of shallow depths of pipe
jacking/microtunneling is the formation of a settlement trough on top of the jacking pipes.
The width of the trough depends on soil properties; the larger is the cover depth of jacking
pipes, the larger is the width of settlement trough. For the same soil volume loss due to pipe
jacking/microtunneling, the width of settlement trough for shallow cover depth is smaller
and therefore it results in a larger vertical maximum settlement.
6. In precast concrete jacking pipes, sometimes grout holes are designed inside these
precast pipes. Why?
Grout holes are present in precast jacking pipes for the following reasons:
(i) They serve as the locations for injection of bentonite or other lubricant. Lubricant is
used for both granular soils and cohesive soils to trim down the frictional resistance.
For cohesive soils, the soils cannot get onto the pipes by the presence of lubricant and
the shearing plane lies within the lubricant as suggested by R. N. Craig (1983). On the
other hand, for granular soils, the lubricant mixes with soils with a significantly reduced
friction. With the use of lubricant, longer pipe lengths can be jacked without the use of
intermediate jacking station.
(ii) They provide the inlet locations for subsequent grouting works after completion of pipe
jacking to fill completely the void space between the pipes and surrounding soils.
(iii)They are used as lifting holes when placing the precast jacking pipes into rails inside
the jacking pits.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
66
Chapter 11 – Piles and Foundation
1. It is not necessary to design nominal reinforcement to piles. Is it true?
In BS8110 and BS5400 Pt.4, they require the provision of nominal reinforcement for
columns. However, for pile design the requirement of nominal reinforcement may not be
necessary. Firstly, as piles are located underground, the occurrence of unexpected loads to
piles is seldom. Secondly, shear failure of piles is considered not critical to the structure
due to severe collision. Moreover, the failure of piles by buckling due to fire is unlikely
because fire is rarely ignited underground.

2. How do rock sockets take up loads?
The load transfer mechanism is summarized as follows:
When a socketed foundation is loaded, the resistance is provided by both rock socket wall
and the socket base and the load distribution is a function of relative stiffness of foundation
concrete and rock mass, socket geometry, socket roughness and strength. At small
displacements the rock-socket system behaves in an elastic manner and the load
distribution between socket wall and socket end can be obtained from elastic analysis. At
displacements beyond 10-15mm, relative displacement occurs between rock and
foundation and the socket bond begins to fail. This results in reduction of loads in
rock-socket interface and more loads are transferred to the socket end. At further
displacements, the interface strength drops to a residual value with total rupture of bond
and more loads are then distributed to the socket end.
3. In designing mini-piles, should the strength of grout be neglected during assessment
of loading carrying capacity?
In designing min-piles, there are two approaches available:
(i) In the first approach, the axial resistance provided by the grout is neglected and steel
bars take up the design loads only. This approach is a conservative one which leads to
the use of high strength bars e.g. Dywidag bar. One should note that bending moment
is not designed to be taken up by min-piles because of its slender geometry.
(ii) In the second approach, it involves loads to be taken up by both grout and steel bars
together. In this way, strain compatibility requirement of grout and steel has to be
satisfied.
4. What are the considerations in determining whether casings should be left in for
mini-piles?
Contrary to most of pile design, the design of min-piles are controlled by internal capacity
instead of external carrying capacity due to their small cross-sectional area.
There are mainly two reasons to account for designing mini-piles as friction piles:
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
67
(i) Due to its high slenderness ratio, a pile of 200mm diameter with 5m long has a shaft
area of 100 times greater than cross-sectional area. Therefore, the shaft friction
mobilized should be greater than end resistance.
(ii) Settlements of 10%-20% of pile diameter are necessary to mobilize full end bearing
capacity, compared with 0.5%-1% of pile diameter to develop maximum shaft
resistance.
Left-in casings for mini-piles have the following advantages:
(i) Improve resistance to corrosion of main bars;
(ii) Provide additional restraint against lateral buckling;
(iii) Improve the grout quality by preventing intrusion of groundwater during concreting;
(iv) Prevent occurrence of necking during lifting up of casings during concreting.
5. What is the purpose of post-grouting for mini-piles?
Post-grouting is normally carried out some time when grout of the initial grouting work has
set (e.g. within 24 hours of initial grouting). It helps to increase the bearing capacity of
mini-piles by enhancing larger effective pile diameter. Moreover, it improves the behaviour
of soils adjacent to grouted piles and minimizes the effect of disturbance caused during
construction. In essence, post-grouting helps to improve the bond between soils and grout,
thereby enhancing better skin friction between them.
During the process of post-grouting, a tube with a hole at its bottom is lowered into the pile
and grout is injected. The mechanism of post-grouting is as follows: the pressurized grout
is initially confined by the hardened grout and can hardly get away. Then, it ruptures the
grout cover and makes its way to the surrounding soils and into soft regions to develop an
interlock with harder soil zones. In order to enhance the pressurized grout to rupture the
initial grout depth, a maximum time limit is normally imposed between the time of initial
grouting and time of post-grouting to avoid the development of high strength of initial
grout. Consequently, the effect of soil disturbance by installation of casings and subsequent
lifting up of casings would be lessened significantly.
6. In designing the lateral resistance of piles, should engineers only use the earth
pressure against pile caps only?
In some design lateral loads are assumed to be resisted by earth pressure exerted against the
side of pile caps only. However, it is demonstrated that the soil resistance of pile lengths do
contribute a substantial part of lateral resistance. Therefore, in designing lateral resistance
of piles, earth pressure exerted on piles should also be taken into consideration.
In analysis of lateral resistance provided by soils, a series of soil springs are adopted with
modulus of reaction kept constant or varying with depth. The normal practice of using a
constant modulus of reaction for soils is incorrect because it overestimates the maximum
reaction force and underestimates the maximum bending moment. To obtain the profile of
modulus of subgrade reaction, pressuremeter tests shall be conducted in boreholes in site
investigation. Reference is made to Bryan Leach (1980).
7. In some codes, they limit the ratio of weight of hammer to weight of pile for pile
driving. What is the reason behind this?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
68
When a hammer with initial motion collides with a stationary pile, the transfer of energy is
most efficient when the two masses are comparable. That is the reason why some codes
limit the ratio of weight of hammer to the weight of pile to be more than 0.5. If the weight
of hammer is too low, most of energy during hammer driving is distributed to the hammer
and this causes tension induced in hammer and results in inefficient transfer of energy.
8. Should engineers rely solely on Hiley’s formula in the design of H-piles?
About 90% of H-piles adopt Hiley’s formula for design. However, this formula is only
applicable to pile lengths less than 30m and is suitable for course-grained materials (not
suitable to fine-grained soils) as suggested by GEO (1996). In Hiley’s formula, by
observing the penetration of piles after the hammer impact, the pile capacity could be
readily obtained from the response of the impacting force. Therefore, the individual pile
capacity could be obtained by this dynamic method.
However, in normal foundation, groups of H-piles are present and the soil foundation may
not be able to support these H-piles simultaneously even though individual piles are proven
to have sufficient capacity by using dynamic method. In this case, static method should be
employed to ascertain if the soil foundation could support these H-piles.
9. What is the function of drilling fluid in rotary drilling in site investigation?
Drilling fluid in rotary serves two main purposes:
(i) Facilitate the rotation of drilling tube during rotary drilling;
(ii) Act as a cooling agent to cool down heat generated during drilling operation.
Traditionally, water is normally employed as drilling fluid. However, it suffers from the
following drawbacks:
(i) It affects the stability of nearby ground with the introduction of water into the
borehole (borehole for soil; drillhole for rock);
(ii) It affects the quality of sample by changing the water content of soil samples
collected from the borehole/drillhole.
Substitutes are available in market to replace water as drilling fluid (e.g. white foam).
10. What are the differences in function between rock anchors and rock sockets?
Rock anchors are used primarily for resisting uplift forces. On the contrary, rock sockets
serve three main purposes:
(i) Rock socket friction and end bearing to resist vertical load;
(ii) Passive resistance of rock sockets contribute to resistance of lateral load; and
(iii) Socket shaft friction is also used for resisting uplifting forces. But only 70% of this
capacity should be used because of the effect of negative Poisson ratio.
Note: Rock anchors, which may consist of a high tensile bar or a stranded cable, are provided for tension piles
when there are insufficient soil covers to develop the required uplifting resistance.
11. What are the functions of cap block, drive cap and pile cushion in driven piles?

Cap block is installed between the hammer end and the drive cap to control the hammer
blow in order to protect both the hammer and the pile from damage. When the hammer hits
the cap block, it compresses elastically and reduces the peak forces, thereby lengthening
the time of hammer blow. Moreover, it should be capable of transmitting the hammer
energy effectively to the piles.
Drive cap is inserted at hammer tip to enhance uniform distribution of hammer energy to
the pile. Pile cushion is positioned between the drive cap and the pile top. It intends to
protect the pile from driving stress induced during hammer blows. Moreover, it also serves
to provide a uniform driving load on top of the pile.
12.What is the significance of driving sequence of driven piles?
For basement construction, if piles are driven from the centre to the perimeter, there is a
tendency of soils to move outwards. Such lateral movement of soil may cause damage to
nearby structures and utilities.
However, if piles are driven from the outside perimeter inwards, there are little soil lateral
movements. This results in a well-compacted centre with an excess pore water pressure
built up to resist the loading of piles. Consequently, shorter pile lengths than the original
designed ones may result. However, some time after the pile driving operation, the excess
pore water pressure is dissipated and the shorter driven piles may not be able to take up the
original design loads. In this situation redriving is required to drive the piles to deeper
depths after dissipation of excess pore water pressure.
13. What is the function of followers in driven H-piles?
A follower is an extension between the pile head and the hammer that transfers the blow to
the pile in which the pile head cannot be reached by the hammer or is under water .For
construction of driven piles, the piling frame and hammer are normally erected on existing
ground level but not at the base of pile caps. However, H-piles are designed to be
terminated near the base of pile caps. If piles are driven at ground level, a certain length of
H-piles is wasted and cut when constructing pile caps. In this connection, pile followers are
used so as to save the wasted section of H-piles because followers can be removed during
subsequent construction of pile caps.
14. What are the advantages of using top-down approach in basement construction?
The advantages of top-down approach are listed below:
(i) The structures above ground can be carried out simultaneously with the structures
below ground. This greatly reduces the time for construction.
(ii) By using this approach, settlement can be reduced.
(iii) Since the permanent columns and slabs can be utilized to support loadings during
construction, it saves the cost of formwork.
Note: Top-down approach means construction of basement is carried out from ground level downwards.
15. What are the methods to tackle negative skin friction?

(i) Use slender pile sections (e.g. H-pile or precast pile) because smaller pile area when
subject to the same working load would produce higher deformation, thus increasing
the relative downward movement of piles.
(ii) In a certain region of H-piles for ground water table fluctuation, painting is applied on
the surface of H-piles because the rise and fall of water table contribute to the
corrosion of H-piles. On the other hand, to reduce the effect of additional loads
brought about by negative skin friction, bitumen is applied on the pile surface
corresponding to the region of soils that has negative skin friction. However, bitumen
should not be applied to the whole section of H-piles because it would be unable to
derive the designed frictional reaction from soils.
(iv) Design the piles as end-bearing so that they can take up more load.
16. In piling works, normally founding levels of bored piles are defined by using total
core recovery or rock quality designation (RQD). Are there any problems with such
specification?
The use of total core recovery to determine the founding level may not be able to indicate
the quality of rock foundation for piles because it depends on the drilling technique and
drilling equipment (GEO (1996)). For instance, if standard core barrels are used to collect
samples, it may indicate sufficient core recovery for samples full of rock joints and
weathered rock. On the other hand, if triple tube barrels are used for obtaining soil samples,
samples with joints and weathered rock can also achieve the requirements of total core
recovery.
In case RQD is adopted for determining founding levels, it may also result in incorrect
results. For instance RQD does not indicate the joints and infilling materials. Moreover, as
it only measures rock segments exceeding 100mm, rock segments exceeding 100mm is
considered to be of good quality rock without due consideration of its strength and joint
spacing.
17. What are the head details of H-piles under compression and subject to bending
moment?
For steel sections referred to in BS5950, universal bearing pile is characterized by having
equal flange and web thickness while universal column has different flange and web
thickness. Universal columns can also be used as bearing piles.
In the design of the head details of H-piles, there are three typical cases to be considered,
namely compression piles, tension piles and piles with bending moment at the head in
addition to tension or compression. The design of these piles recommended by G. M.
Cornfield (1968) is listed below:
(i) Compression piles
For this type of piles, H-piles should be embedded 150mm in concrete pile caps and it is
not necessary to use any dowels and capping plates in their connection.
(ii) Tension piles
A number of hook-ended bars are welded to the top of H-piles.

(iii) Piles with bending moment at their head (tension or compression)
The depth of embedment of piles into pile caps is substantially increased and loads are
transferred by horizontal bars welded to piles’ flanges.
18. In deep excavation, adjacent ground water table is drawn down which may affect
the settlement of nearby buildings. What is the remedial proposal to rectify the
situation?
One of the methods to control settlement of nearby buildings due to excavation work is by
recharging. Water collected in wells in deep excavation is put back to the top of excavation
in order to raise the drawn-down water table. The location of recharge should be properly
selected to ensure the soil is sufficiently permeable to transfer the pumped water back near
the affected buildings.
19. What is the significance of quality of bentonite slurry in the construction of
diaphragm walls?
The quality of slurry plays an important role in the quality of diaphragm walls. Firstly, if a
thick slurry cake is formed in the interface between slurry and in-situ soil, it has a tendency
to fall off during concreting works and it mixes with freshly placed concrete. Moreover,
large thickness of slurry cake would reduce the concrete cover and affect the future
durability performance of diaphragm walls.
20. During concreting of diaphragm walls, three tremie pipes are used in one time.
However, only one concrete truck is available. How should the concreting works be
carried out?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
72
The most ideal situation is to supply each tremie pipe with a single concrete truck.
However, if only one concrete truck is available, all the fresh concrete in the truck should
not be placed in one single tremie pipe. With all fresh concrete placed in one single tremie
pipe while the others left void, then due to the huge supply of concrete to the tremie pipe, a
small concrete hump may form at the base of the tremie pipe and it is likely that it may
collapse and trap the slurry inside the diaphragm walls. Therefore, the fresh concrete
should be evenly shared among the tremie pipes to avoid such occurrence.
21. What is the purpose of conducting load test for piling works?
Pile load test provides information on ultimate bearing capacity but not settlement behavior.
In essence, it can determine if the load is taken up by the stratum designed or if the centre
of resistance is at the design location in piles as suggested by Robert D. Chellis (1961).
After conducting load tests, the curve of movement of pile head (Settlement against load)
and the curve of plastic deformation can be plotted. By subtracting the curve of plastic
deformation from the curve of pile head movement at each load, the curve of elastic
deformation can be obtained. For piles of end-bearing type unrestrained by friction, the
theoretical elastic deformation can be calculated from e=RL/AE where e is elastic
deformation, L is pile length, A is area of pile, E is Young’s Modulus of pile material and
R is the reaction load on pile. By substituting e in the formula, the elastic deformation read
from the curve of elastic deformation, L can be obtained which shows the location of the
centre of resistance corresponding to that load.
22. Why are vibrators not used in concrete compaction in piling works?
Concrete for piles should be a high-slump self-compacting mix which is capable of flowing
between reinforcement cage with ease. Since concrete is designed to be self-compacting,
vibrators are not used for providing further compaction. Moreover, the concrete in piles is
compacted by energy derived from free falling. However, if vibrators are used, the vibrated
concrete may be compacted to the sides of the concrete casings and hinders the lifting up of
casings. Reference is made to GEO (1996).
23. In Hiley’s formula for driven piles i.e. R=E/(s+0.5c), why is a coefficient of 0.5
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
73
applied for the term elastic deformation of piles and soil?
Hiley’s formula is based on the principle of energy conservation in which the energy
brought about by hammers during the action of hitting are transferred to piles in ground.
When the hammer force and displacement is plotted, the energy absorbed by piles is the
area under the curve. Since the curve of elastic component is linear with a positive slope,
the area i.e. energy should be the area of triangle (0.5xRxc) where R is reaction force and c
is elastic compression due to helmet, piles and soil system. For settlement, it is of
horizontal line in force-displacement diagram and hence the energy transferred to pile-soil
system is (Rxs).
24. For a rigid pile cap with vertical piles at the middle and raking piles at the sides,
what is the pattern of load distribution of piles in such arrangement?
Due to the effect of interaction of individual piles, the central piles tend to settle more than
the edge piles when the pile cap is under a uniform load. Therefore, raking piles at the edge
take up a higher fraction of total loads and are subject to higher axial and bending loads in
case the pile cap is stiff. In the extreme case, failure of these raking edge piles may occur.
25. What are the problems associated with prestressed concrete piles (Daido)?
The origin of Daido piles comes from Japan where these prestressed concrete piles are used
as replacement plies. Holes are pre-formed in the ground and Daido piles are placed inside
these pre-formed holes with subsequent grouting of void space between the piles and
adjacent ground. However, in Hong Kong Daido piles are constructed by driving into
ground by hammers instead of the originally designed replacement method. Since the
installation method of Daido piles is changed, construction problems like deformation of
pile tip shoes, crushing of concrete at pile tip etc. occur. Reference is made to B. W. Choy
(1993).
26. Which one is a better choice, a large diameter piles or a system of several smaller
piles with the same load capacity?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
74
The choice of a large diameter pile suffers from the disadvantage that serious consequences
would occur in case there is setting out error of the pile. Moreover, in terms of cost
consideration, for the same load capacity the cost of a group of small diameter piles is
generally lower than that of a large diameter pile. On the other hand, for small diameter
piles i.e. mini-piles, they are advantageous in site locations with limited headroom and
space. In addition, in some structures with only a few piles, it is uneconomic because of its
high mobilization cost. Reference is made to Dr. Edmund C Hambly (1979).
27. What is the difference between capping beams and ground beams for piles?
Capping beams for piles aim at transferring loads from closely spaced columns or walls
into a row of piles. On the other hand, ground beams are beams provided between adjacent
pile caps and they perform as compression struts or ties in an attempt to prevent lateral
displacement or buckling of piles under uneven distribution of loads on pile caps. Both of
them have to be specially designed to cater for differential settlement of piles.
Capping beam performs the same functions as pile caps. However, ground beams are
structural elements to connect adjacent pile caps to improve the stability of foundation.
28. In modeling a nonrigid mat foundation by using elastic springs, should a uniform
modulus of subgrade reaction be used along the whole base of mat?
By using a bed of springs to simulate the flexible behaviour of mat subject to loads, care
should be taken in selection of the modulus of subgrade reaction. In fact, the modulus of
subgrade reaction depends on many factors like the width of the mat, the shape of the mat,
the depth of founding level of the mat etc. In particular, the modulus of subgrade reaction is
smaller at the center while it is larger near the mat’s edges. If a constant modulus of
subgrade reaction is adopted throughout the width of the mat, then a more or less uniform
settlement will result when subject to a uniform load. However, the actual behaviour is that
settlement in the center is higher than that at side edges. Consequently, it leads to an
underestimation of bending moment by 18% to 25% as suggested by Donald P. Coduto
(1994).
In general, a constant value of modulus of subgrade reaction is normally applied for
structure with a rigid superstructure and the rigid foundation. However, a variable modulus
of subgrade reaction is adopted instead for non-rigid superstructure and non-dominance of
foundation rigidity to account for the effect of pressure bulbs.
29.What is the difference between direct circulation drilling and reverse circulation
drilling?
For direct circulation drilling and reverse circulation drilling, the major difference in
drilling method is related to the direction of movement of drilling fluid. For direct
circulation drilling, the drilling fluid is circulated from the drill stem and then flows up the
annulus between the outside of the drill stem and borehole wall. The drilling fluid that
carries the drill cuttings flows to the surface and the subsequent settlement pits. Pumps are
employed to lift the cuttings free fluid back to the drill stem.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
75
For reverse circulation drilling, the direction of flow of drilling flow is opposite to that of
direct circulation drilling. Drilling fluid flows from the annulus between the drill stem and
hole wall to the drill stem. The drilling fluid is pumped to an nearby sump pits where
cuttings are dropped and settled.
30. What is the difference between “hammer efficiency” and “coefficient of
restitution” when using Hiley’s formula in pile driving?
Hammer efficiency refers to the ratio of kinetic energy of the hammer to the rate energy (or
potential energy). In essence, there is undoubtedly certain energy losses induced by the
hammer itself prior to the actual impact on the driven pile. For instance, these losses may
include misalignment of the hammer, energy losses due to guiding friction, inaccurate
dropping height etc…
Coefficient of restitution refers to a value indicating the strain energy during collision
regained after the bodies reverted back to their original shapes. If the coefficient of
restitution is equal to unity, it means that the collision is elastic and all energy has been
returned after the impact action. Hence, this is a index showing the degree the impact
action in terms of elasticity.
In mathematical forms,
Coefficient of restitution = -(v1-v2)/ (u1-u2)
Where u=initial velocity and v=final velocity after impact
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
76
Chapter 12 – General
1. What is the difference between working stress approach and limit state approach?
For working stress approach, service loads are used in the whole design and the strength of
material is not utilized in the full extent. In this method of design, stresses acting on
structural members are calculated based on elastic method and they are designed not to
exceed certain allowable values. In fact, the whole structure during the lifespan may only
experience loading stresses far below the ultimate state and that is the reason why this
method is called working stress approach. Under such scenario, the most economical
design can hardly be obtained by using working stress approach which is now commonly
used in the design of temporary works.
For limit state approach, for each material and load, a partial safety factor is assigned
individually depending on the material properties and load properties. Therefore, each
element of load and material properties is accurately assessed resulting in a more refined
and accurate analysis of the structure. In this connection, the material strength can be
utilized to its maximum value during its lifespan and loads can be assessed with reasonable
probability of occurrence. Limit state approach is commonly used for the majority of
reinforced concrete design because it ensures the utilization of material strength with the
lowest construction cost input.
2. What are the functions of different components of paint?
For normal paint application, there are mainly three main components of paint, namely
primer, undercoat and finishing coat.
Primer: This is the first layer of a typical painting system and it is used to inhabit corrosion
and provide a good bond for subsequent coats.
Undercoat: This component acts as a barrier to corrosion agents and even out irregularities
of bonding surface. It also serves to hide the underlying background and prevent the details
and colour of the area of application to affect the designed colour and finishing details of
paint.
Finishing coat: This is the final layer of a typical painting system and it protects the
underlying layers from the effect of adverse weather conditions (e.g. sunlight) and to
provide the designed properties of paint like colour, impermeability, wearing resistance,
etc.
3. If the contractor is liable for defective works for 12 years with contract under seal
(6 years with contract not under seal), then what is the significance of Maintenance
Period?
Defective works constitute a breach of contract in accordance with Limitation Ordinance
(Cap. 347).
An action founded on simple contract (not under seal) shall not be brought after expiration
of 6 years while an action founded with contract under seal shall not be brought after
expiration of 12 years. For construction works, the date of counting these actions should be
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
77
the date of substantial completion.
To answer the above question, one should note that under the contractual requirement, the
contractor during Maintenance Period has the right to rectify the defects and the employer
has also the right to request the contractor to make good defective work. However, after the
expiry of Maintenance Period, in case of any arising of defects, the employer has to employ
others to rectify these works and bring the action to court to claim the contractor for the
costs associated.
4. In checking the quality of weld, what are the pros and cons of various
non-destructive weld inspection methods i.e. ultrasonic test, radiographic inspection
and magnetic particle flaw detection test?
Currently, there are three common non-destructive testing of weld, namely radiographic
inspection, ultrasonic testing and magnetic flaw detection test.
The method of radiographic approach was used commonly in the past until the arrival of
ultrasonic inspection technique. The major difference between the two is that ultrasonic
testing detects very narrow flaws which can hardly be detected by radiographic method.
Moreover, it is very sensitive to gross discontinuities. Tiny defects, which characterize
welding problems, are normally not revealed by radiographic inspection.
Moreover, ultrasonic inspection possesses the advantages that it can accurately and
precisely locate a defect as well as figure out its depth, location and angle of inclination.
In the past, it was expensive to adopt ultrasonic means for inspection. Nowadays, the rates
for both inspection methods are comparable. Most importantly, the x-ray and gamma ray
used in radiographs are radioactive and pose potential safety hazard to testing technicians
on site. Reference is made to Paul G. Jonas and Dennis L. Scharosch.
Magnetic flaw detection test can only be used for checking flaws in any metallic objects.
This method is commonly used for inspecting surface cracks and slightly sub-surface
cracks. However, surface and sub-surface cracks can be readily detected by radiographs
and ultrasonic inspection.
5. Why should acetylene gas cylinders used for gas welding be erected in upright
position?
Acetylene gas is commonly used for gas welding because of its simplicity of production
and transportation and its ability to achieve high temperature in combustion (e.g. around
5,000oF). Acetylene is highly unstable and flammable and would explode in elevated
pressure when reacting with oxygen in air. Storing acetylene gas in cylinders under
pressure is very dangerous. Hence, for welding purpose, gas acetylene is stored in cylinders
of liquid acetone contained in porous material (like firebrick) to enhance there is no free
space left for acetylene gas and for cooling purpose in the event of thermal decomposition.
It also prevents the formation of high pressure air pockets inside the cylinder. Dissolved
acetylene in acetone will no longer in contact with oxygen and is not subject to
decomposition. On the other hand, acetone is used because it is capable of dissolving large
amount of acetylene gas under pressure without changing the nature of the gas.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
78
The cylinders for gas welding i.e. oxygen cylinders and acetylene cylinders, when not in
use should be stored separately because any mixture of these gases resulting from
accidental leakage can be highly explosive. When in use, acetylene cylinders should always
be kept in upright position because acetone liquid will be drawn from the cylinders with the
gas if they are kept horizontally. Consequently, significant leakage of acetone liquid will
result.
Note: Oxygen and acetylene gas cylinders are commonly used in construction sites for gas welding.
6. Is stainless steel really stainless in construction application?
Stainless steel refers to alloy steels with more than 10.5% of chromium and consists of
several groups like austenitic, ferritic, martensitic etc. Austenitic stainless steel is normally
used in structural applications because of its high corrosion resistance. Austenitic and
ferritic types of stainless steel cover about 95% of stainless steel applications. Stainless
steel is not stainless although it is corrosion resistant under a wide range of conditions.
A passive layer of chromium oxide is formed on stainless steel’s surface which renders it
corrosion resistant. This chromium oxide layer acts as a stiff physical barrier to guard
against corrosion and makes it chemically stable. Moreover, when this layer is damaged, it
can perform self repairing where there is a sufficient supply of oxygen. However, stainless
steel will still corrode by pitting in marine environment where chloride attack occurs.
Therefore, appropriate grades and types of stainless steel have to be selected in polluted
and marine environment to minimize the problem of corrosion. Reference is made to Euro
Inox and the Steel Construction Institute (2002).
7. Is the procurement of third party insurance necessary to be incorporated in
contract for construction works?
The purpose of third party insurance is to protect contractors from bankruptcy in case there
are severe accidents happened to the third party due to the construction work. Therefore, in
government contracts, contractors are requested contractually to procure third party
insurance from the commencement of contract until the end of Maintenance Period. If
contractors have the financial capability to handle the claims due to accidents to third party,
the client is not bound to include this requirement in the contract.
8. What is the mechanism of protection by hot dip galvanizing?
Hot dip galvanizing protects steel/iron from corrosion by:
(i) It forms a metallic zinc and zinc-iron alloy coating on top of steel surface. This zinc
coating reacts with moisture in atmosphere to from zinc salts which act as an
insulating layer for steel/iron.
(ii) Zinc is higher than steel/iron in the galvanic series and when these dissimilar metals
with different electrical potential are in contact, the zinc anode corrodes and offers
sacrificial protection to steel/iron and hence steel/iron is protected from corrosion.
9. The insurance policy of insurance companies has changed recently. What is the
major change?
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
79
Original Clause 4.6.1
“Liability in respect of death, bodily injury, illness or disease suffered by any person
employed by an insured Contractor or employed by any party to whom part or parts of the
insured Contract have been sub-contracted. However, this exclusion shall not apply to any
liability which may attach to any sub-contractor insured under this Policy in respect of
death, bodily injury or illness or disease suffered by a person employed by any other
sub-contractor.”
Revised Clause 4.6.1
“Liability in respect of death, bodily injury, illness or disease suffered by:
1) Any person employed by any insured party i.e. principal contractors, sub-contractors,
sub-sub-contractors for the purpose of execution of insured contract or any parts
thereof and
2) Any person to whom part or parts of the insured contract have been sub-contacted
including but not limited to self employed sub-contractors.”
In essence, the original clause 4.6.1 has no cover for death/injury to employees of
contractors or sub-contractors because they should have separate insurance cover under
employee’s compensation ordinance. However, it does not exclude the liability for “worker
to worker” i.e. sub-sub-contractors. For the revised Clause 4.6.1, it rules out the liability for
death/injury to employees of any insured party.
10. Should design life be the same as return period for design conditions?
Design life means the minimum duration a structure is expected to last. The longer is the
design life; the higher is the cost of a project. Therefore, in choosing the design life for a
structure, engineers should consider the design life which generates a economical project
without sacrificing the required function.
In selection of return period of certain design conditions, winds, waves, etc., one should
consider the consequences of exceedance. In fact, there are normally no extreme maximum
values of these design conditions and its selection is based on the probability of exceedance
which is related to return period.
Therefore, design life may not be equal to return period of design conditions because their
selections are based on different considerations.
11. What is the difference between sureties and security?
In construction contracts, if a contractor fails to perform the works, the employer would
suffer from severe financial loss and therefore some forms of protection has to be
established in the contract.
For surety bond, the contractor obtains a guarantee from a third party i.e. a bank or an
insurance company, which in return for a fee, agrees to undertake the financial
responsibility for the performance of contractor’s obligations. This third party will pay to
the employer in case there is a contractor’s default.
For security, a sum of money is deposited in the employer’s account and upon satisfactory
fulfillment of contractor’s obligations, the sum will be repaid to the contractor.
200 Questions and Answers on Practical Civil Engineering Works Vincent T. H. CHU
80
12. What is the difference between fasteners, bolts and screws?
Fastener is a general term to describe something which is used as a restraint for holding
things together or attaching to other things.
The main physical distinction between screws and bolts is that screws are entirely full of
threads while bolts contain shanks without threads. However, a better interpretation of the
differences between the two is that bolts are always fitted with nuts. On the contrary,
screws are normally used with tapped holes.
13. What is the function of washers when using bolts?
The purpose of installing washers in a typical bolting system is to distribute the loads under
bolt heads and nuts by providing a larger area under stress. Otherwise, the bearing stress of
bolts may exceed the bearing strength of the connecting materials and this leads to loss of
preload of bolts and creeping of materials. Alternatively, flanged fasteners instead of using
washers could be adopted to achieve the same purpose.
14. What is the difference between normal bolts and high friction grip bolts?
High friction grip bolts are commonly used in structural steelwork. They normally consist
of high tensile strength bolts and nuts with washers. The bolts are tightened to a shank
tension so that the transverse load across the joint is resisted by the friction between the
plated rather than the bolt shank’s shear strength.